Changes

Jump to navigation Jump to search

Gaekwar's Petlad Railway

112 bytes removed, 16:33, 3 February 2016
Fully checked; Further Info added with link, minor text changes
The '''Gaekwar's Petlad Railway''' was opened in 1896 May 1890 between [[Petlad]] and [[Anand]], a distance of 13 miles(21km). It was a broad gauge([[Rail_gauge#Broad_Gauge|BG]]) line and worked by Bombay, Baroda and Central India Railway(BB&CIR).<ref name=name>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n25/mode/2up " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 17]; Retrieved 17 Jan 2016</ref><ref>[https://books.google.co.uk/books?id=3VQTAAAAYAAJ&pg=PA412&lpg=PA412&dq=Petlad-Cambay+Railway&source=bl&ots=eoKF25izT3&sig=dusWgQ1um3G5MMaRpx5OckIsNc0&hl=fr&sa=X&ved=0CFkQ6AEwCWoVChMIlcSyyquayQIVgSwPCh21sgX2#v=onepage&q=Petlad&f=false "The India List and India Office List 1905"Page 412]; Retrieved 11 Dec 2015</ref>
The railway was owned by by the [[Princely states|Princely ]][[Baroda State]].
<ref>[https:name=name//ia801009.us.archive.org/8/items/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System.pdf " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 19]; Retrieved 5 Jan 2016</ref>
In 1901 extensions were added bringing the track length to 32 miles(51km) and the entire line was worked by BB&CIR. At about this time it apparently became was renamed the '''[[Petlad-Cambay Railway]]''' Later it was worked by [[Gaekwar's Baroda State Railway]](GBSR) ==External LinksFurther Information==*See '''[http://www.irfca.org/docs/19century[Petlad-routes.html "Cambay Railway Network Sizes in 1891 and 1895"] IRFCA "Indian Railways Fan Club"]'''
== References ==
9,628
edits

Navigation menu