Difference between revisions of "Khijadiya-Dhari Railway"

From FIBIwiki
Jump to navigation Jump to search
(Reference added and additional text)
(External link corrected, map added and minor revisions)
 
(2 intermediate revisions by the same user not shown)
Line 24: Line 24:
 
|stations= [[Khijadiya]], [[Dhari]]
 
|stations= [[Khijadiya]], [[Dhari]]
 
|system1date= 1913
 
|system1date= 1913
|system1details= [[Gondal Railway|Gondal Railways]]
+
|system1details= [[Gondal-Porbandar Railway]]
 
|system2date=
 
|system2date=
 
|system2details=  
 
|system2details=  
Line 30: Line 30:
 
|system3details=   
 
|system3details=   
 
}}
 
}}
 +
[[File:Khijadiya-Dhari Railway.png|thumb| Khijadiya-Dhari Railway ]]
 +
The '''Khijadiya-Dhari Railway''' (KDR) was a  Metre Gauge([[Rail_gauge_#Metre_Gauge|MG]]) line, worked as part of the [[Gondal-Porbandar Railway]] and owned by [[Princely states|Princely ]][[Baroda State]] Durbar.
 +
<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n192/mode/1up  " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta; page 183]; Retrieved 15 Jun 2019</ref>
  
The '''Khijadiya-Dhari Railway''' (KDR) was a  Metre Gauge([[Rail_gauge_#Metre_Gauge|MG]]) line, part of [[Gondal Railway|Gondal Railways]] and owned by [[Baroda]] Durbar.
+
The first section from [[Khijadiya]] opened in 1913; where there was a connection with the [[Gondal-Porbandar Railway]] ; extended in 1914 and reached [[Dhari]] in 1916, a total length of 37 miles(59km)
<ref>[https://ia801009.us.archive.org/8/items/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System.pdf " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta; page 183]; Retrieved 18 Dec 2015</ref>
+
<ref>[http://dspace.gipe.ac.in/xmlui/bitstream/handle/10973/18185/GIPE-015962.pdf?sequence=3&isAllowed=y “Administration Report on the Railways in India 1916” page 13]; Retrieved 25 Jun 2019</ref>
  
The DHR connected with the [[Gondal-Porbandar Railway]] at [[Khijadiya]]. The first section opened in 1913; extended in 1914 and reached [[Dhari]] in 1916, a total length of 37 miles(59km)
+
In 1919 the [[Gondal Railway]](GR) was formed and worked the KDR as a branch line.
<ref>[http://dspace.gipe.ac.in/xmlui/bitstream/handle/10973/18185/GIPE-015962.pdf?sequence=3&isAllowed=y “Administration Report on the Railways in India 1916” page 13]; Retrieved 27 Dec 2015</ref>
+
 
 +
 
 +
== Further Information==
 +
See '''[[Gondal Railway]]'''
  
 
== References ==
 
== References ==

Latest revision as of 16:44, 15 June 2019

Khijadiya-Dhari Railway
[[Image:|150px| ]]
Line of route
Khijadiya to Dhari
Gauge / mileage
Metre gauge 37 miles (1922)
Timeline
1913 Opened to traffic
Key locations
Presidency Bombay
Stations Khijadiya, Dhari
System agency
1913 Gondal-Porbandar Railway
How to interpret this infobox
Khijadiya-Dhari Railway

The Khijadiya-Dhari Railway (KDR) was a Metre Gauge(MG) line, worked as part of the Gondal-Porbandar Railway and owned by Princely Baroda State Durbar. [1]

The first section from Khijadiya opened in 1913; where there was a connection with the Gondal-Porbandar Railway ; extended in 1914 and reached Dhari in 1916, a total length of 37 miles(59km) [2]

In 1919 the Gondal Railway(GR) was formed and worked the KDR as a branch line.