Early Railway Experiments and Proposals: Difference between revisions

Jump to navigation Jump to search
PEA-2292 (talk | contribs)
PEA-2292 (talk | contribs)
mNo edit summary
 
(3 intermediate revisions by the same user not shown)
Line 32: Line 32:
[[Adyar River Tramway|'''Adyar River Tramway Proposal, 1842-43''' - see separate page for details]]
[[Adyar River Tramway|'''Adyar River Tramway Proposal, 1842-43''' - see separate page for details]]
<blockquote>In 1842 a proposal was put forward to provide a stone tramway to connect south [[Madras]] to the outlying districts of Santhome and Mylapore. A bridge carrying over the Adyar River named the [[Elphinstone Bridge]] had been constructed about 1840 during the time of Lord Elphinstone, who was governor of Madras from 1837 to 1842. The proposal was to construct a stone tramway on the existing bridge, presumably to convey carts pulled by bullock and extended over existing roads. A short length was constructed but in 1843 the experiment was abandoned. </blockquote>   
<blockquote>In 1842 a proposal was put forward to provide a stone tramway to connect south [[Madras]] to the outlying districts of Santhome and Mylapore. A bridge carrying over the Adyar River named the [[Elphinstone Bridge]] had been constructed about 1840 during the time of Lord Elphinstone, who was governor of Madras from 1837 to 1842. The proposal was to construct a stone tramway on the existing bridge, presumably to convey carts pulled by bullock and extended over existing roads. A short length was constructed but in 1843 the experiment was abandoned. </blockquote>   
[[Godavari Dam Construction Railway|'''Godavari Dam Construction Railway, 1845''' - see separate page for details]]
<blockquote>The railway was built for transporting materials for the construction of the Dowlaisweram Anicut at Rajahmundry (which is now located in Andhra Pradesh). This was a dam was built over the Godavari River as part of the scheme to irrigate the Godavari delta around 1845.Work on the project was started in 1845 under the direction of Captain A Cotton and as far as can be ascertained the railway was in use from the start of the project. The project was completed in 1852 and the railway was closed down.</blockquote>


[[East India Company - Early Proposals for Railways, 1845|'''East India Company - Early Proposals for Railways, 1845''' - see separate page for details]]
[[East India Company - Early Proposals for Railways, 1845|'''East India Company - Early Proposals for Railways, 1845''' - see separate page for details]]
<blockquote>In May 1845 the [[East India Company]](EIC) authorised the experiment of two sections of railway.[[East Indian Railway|East Indian Railway Company]] and the [[Great Western Bengal Railway Company]] had amalgamated and were awarded the contract for the experimental lines from  [[Calcutta]] to [[Delhi]] via [[Mirzapur|Mirzapore(Mirzapur)]].</blockquote>
<blockquote>In May 1845 the [[East India Company]](EIC) authorised the experiment of two sections of railway.[[East Indian Railway|East Indian Railway Company]] and the [[Great Western Bengal Railway Company]] had amalgamated and were awarded the contract for the experimental lines from  [[Calcutta]] to [[Delhi]] via [[Mirzapur|Mirzapore(Mirzapur)]].</blockquote>


[[Godavri Dam Construction Railway|'''Godavri Dam Construction Railway, 1845''' - see separate page for details]]
[[Great Trunk Railway from Calcutta|'''Great Trunk Railway from Calcutta, 1845-46''' - see separate page for details]]
<blockquote>The railway was built for transporting materials for the construction of the Dowlaisweram Anicut at Rajahmundry (which is now located in Andhra Pradesh). This was a dam was built over the Godavari River as part of the scheme to irrigate the Godavari delta around 1845.Work on the project was started in 1845 under the direction of Captain A Cotton and as far as can be ascertained the railway was in use from the start of the project. The project was completed in 1852 and the railway was closed down.</blockquote>
<blockquote>During 1845 and 1846 significant discussions, reports and papers were being prepared and circulated as proposed in the minutes of the Honourable the Court of Directors of the [[ East India Company]](EIC), of the 7th May, 1845. A Report was made from a personal examination of the country, upon the direction of a line to be recommended for a railroad from [[Calcutta]] to [[Mirzapur|Mirzapore(Mirzapur)]] and the [[North West Provinces]]. This comprehensive Report with other papers, letters and observations has been transcribed in full by Fibis - as it contains significant details and analysis [[Great Trunk Railway from Calcutta|''- see separate page for details'']]. The Report also contains comments on the 'Experimental Line', i845, mentioned above
[[Great Trunk Railway from Calcutta#Experimental Line Proposal|''- see separate page for details'']]</blockquote>


[[Solani River Aquaduct Construction Railway|'''Solani River Aquaduct Construction Railway, 1846''' - see separate page for details]]  
[[Solani River Aquaduct Construction Railway|'''Solani River Aquaduct Construction Railway, 1846''' - see separate page for details]]  
Line 47: Line 51:
[[Dowlaiswaram Anicut Railroad|'''Dowlaiswaram Anicut Railroad, Rajahmundry, 1846'''- see separate page for details]]  
[[Dowlaiswaram Anicut Railroad|'''Dowlaiswaram Anicut Railroad, Rajahmundry, 1846'''- see separate page for details]]  
<blockquote>A railroad constructed to transport  dam building materials over the Godavry River. Constructed 1846 as part of Captain [[Arthur Thomas Cotton]]’s irrigation scheme. Wagons hauled by ponies or men. Project completed 1852 and assumed railway dismantled.</blockquote>
<blockquote>A railroad constructed to transport  dam building materials over the Godavry River. Constructed 1846 as part of Captain [[Arthur Thomas Cotton]]’s irrigation scheme. Wagons hauled by ponies or men. Project completed 1852 and assumed railway dismantled.</blockquote>
[[Calcutta to Delhi Railway Proposal 1852-53|'''Calcutta to Delhi Railway Proposal 1852-53''' - see separate page for details]]
<blockquote>There was a proposal in 1852-53 there were further discussions and exchange of correspondence concerning the railwaybetween Calcutta and Delhi.</blockquote>


[[Masulipatam and Hyderabad Light Railway|'''Masulipatam and Hyderabad Tramway/Light Railway/Tramway Proposal 1854-55''' - see separate page for details]]  
[[Masulipatam and Hyderabad Light Railway|'''Masulipatam and Hyderabad Tramway/Light Railway/Tramway Proposal 1854-55''' - see separate page for details]]