Indian Midland Railway: Difference between revisions

Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Map added, total review and rewrite with new links
PEA-2292 (talk | contribs)
mNo edit summary
 
(One intermediate revision by the same user not shown)
Line 42: Line 42:
*1886, the initial section of IMR, from [[Bhopal]]  to [[Agra|Agra Cantonment]] was completed by May 1881. The railway connected to the ‘[[Rajputana-Malwa State Railway]]’(RMSR) near the Cantonment Station at Agra (The RMSR only existed until 1885 when it became part of the ‘[[Bombay, Baroda and Central India Railway]]’(BB&CIR)) . The entire line was amalgamated into GIPR, 1900 becoming the [[Great_Indian_Peninsula_Railway_-_Lines_owned_and_worked#GIPR_Midland_Mainline |‘GIPR Midland Mainline’ ]]
*1886, the initial section of IMR, from [[Bhopal]]  to [[Agra|Agra Cantonment]] was completed by May 1881. The railway connected to the ‘[[Rajputana-Malwa State Railway]]’(RMSR) near the Cantonment Station at Agra (The RMSR only existed until 1885 when it became part of the ‘[[Bombay, Baroda and Central India Railway]]’(BB&CIR)) . The entire line was amalgamated into GIPR, 1900 becoming the [[Great_Indian_Peninsula_Railway_-_Lines_owned_and_worked#GIPR_Midland_Mainline |‘GIPR Midland Mainline’ ]]
** ‘Bhopal-Jhansi Section’ via Bina; 1880, 180 miles(290km)  
** ‘Bhopal-Jhansi Section’ via Bina; 1880, 180 miles(290km)  
** ‘Jhansi-Gwallior Section’; 1880, 60 miles(97km)
** ‘Jhansi-Gwalior Section’; 1880, 60 miles(97km)
** ‘Gwallior-Dholpur Section’; 1879-80-81, 40 miles(64km) - originally [[Scindia State Railway]] - see Note A
** ‘Gwalior-Dholpur Section’; 1879-80-81, 40 miles(64km) - originally [[Scindia State Railway]]- ''see Note A''
** ‘Dholpur-Agra Cantonment Section’; 1878, 36 miles(58km) - originally [[Scindia State Railway]] - see Note A
** ‘Dholpur-Agra Cantonment Section’; 1878, 36 miles(58km) - originally [[Scindia State Railway]]- ''see Note A''
<blockquote>Note A:- These  two sections, described in some documents as the  ‘[[Agra-Gwalior Railway]]’, completed 1881; Indian State line, owned by Gwallior Durbar, known as [[Scindia State Railway]]. </blockquote>
<blockquote>''Note A:-'' These  two sections, described in some documents as the  ‘[[Agra-Gwalior Railway]]’, completed 1881; Indian State line, owned by Gwalior Durbar. This railway was known as [[Scindia State Railway]]’ and was handed over to the IMR under a Contract dated  March 1890. <ref> British Library IOR/L/F/8/13 (953) ‘Contract with the Indian Midland Railway Company Limited as to the handing over of the Sindia State Railway’, 18 March 1890</ref></blockquote>
* 1886-88 ‘Jhansi- Cawnpore Section’ , was under construction when the IMR was formed. ; from [[Jhansi ]] to [[Cawnpore]], 1886-88, 136 miles(219km);  later known as the  ‘Cawnpore Branch’- see Note B
* 1886-88 ‘Jhansi- Cawnpore Section’ , was under construction when the IMR was formed. ; from [[Jhansi ]] to [[Cawnpore]], 1886-88, 136 miles(219km);  later known as the  ‘Cawnpore Branch’- ''see Note B''
<blockquote>Note B:-  Early records describe part of this as the ‘[[Jhansi-Konch-Kalpi Railway]]’.  In fact the line, when constructed, ran from [[Jhansi]] to [[Kalpi]] on onward to [[Cawnpore]].  Konch was only connected in 1903 by the GIPR  ‘[[Ait-Kunch Branch Railway]]’. </blockquote>
<blockquote>''Note B:-'' Early records describe part of this as the ‘[[Jhansi-Konch-Kalpi Railway]]’.  In fact the line, when constructed, ran from [[Jhansi]] to [[Kalpi]] on onward to [[Cawnpore]].  Konch was only connected in 1903 by the GIPR  ‘[[Ait-Kunch Branch Railway]]’. </blockquote>


==Lines worked and developed by IMR==
==Lines worked and developed by IMR==
Line 53: Line 53:
* ‘[[Jhansi-Manikpore State Railway]]’ ; a further section of the IMR, opened in 1889; amalgamated into GIPR,1900
* ‘[[Jhansi-Manikpore State Railway]]’ ; a further section of the IMR, opened in 1889; amalgamated into GIPR,1900
* ‘[[Bina-Katni Railway]]’ - a further section of the IMR, opened in 1889; amalgamated into GIPR,1900
* ‘[[Bina-Katni Railway]]’ - a further section of the IMR, opened in 1889; amalgamated into GIPR,1900
* ’[Bina-Goona-Baran Railway]]’ - opened by IMR, 1889, amalgamated into GIPR, 1900
* ’[[Bina-Goona-Baran Railway]]’ - opened by IMR, 1889, amalgamated into GIPR, 1900
* ‘[[Cawnpore-Kalpi-Jhansi Railway]]’ - line completed 1888 by IMR; amalgamated into GIPR,1900
* ‘[[Cawnpore-Kalpi-Jhansi Railway]]’ - line completed 1888 by IMR; amalgamated into GIPR,1900
* ‘[[Bhopal-Ujjain Railway]]’ - opened c.1895, Indian State line worked by IMR; amalgamated into GIPR, 1900  
* ‘[[Bhopal-Ujjain Railway]]’ - opened c.1895, Indian State line worked by IMR; amalgamated into GIPR, 1900