Difference between revisions of "Borjan-Suntak Steam Tramway"

From FIBIwiki
Jump to navigation Jump to search
(Data added, links checked, Work-in-progress removed)
 
(5 intermediate revisions by 2 users not shown)
Line 2: Line 2:
  
 
Proposal  in 1906 from the Assam Company for the construction of a steam tramway to convey coal from the coalfield of that Company in the Naga Hills to the [[Assam-Bengal Railway]](ABR) sidings at Suntak in the Sibsagar district.
 
Proposal  in 1906 from the Assam Company for the construction of a steam tramway to convey coal from the coalfield of that Company in the Naga Hills to the [[Assam-Bengal Railway]](ABR) sidings at Suntak in the Sibsagar district.
 +
<ref>[https://archive.org/stream/RailwayProjects/Railway%20projects#page/n25/mode/2up archive.org - "Histories of (Indian)Railway Projects ...up to June 1906"; Page 5];Retrieved 10 Dec 2015</ref><ref>[https://books.google.fr/books?id=24iKabhn4fcC&pg=PA53&lpg=PA53&dq=Coal+BORJAN+Railway&source=bl&ots=8_L0irkQiy&sig=oLV1NJuyO3icIJmwnNJmRLPdT9Q&hl=en&sa=X&ei=rveLVeV4x45T58aaoAM&ved=0CDEQ6AEwAw#v=onepage&q=Coal%20BORJAN%20Railway&f=false) Google Books "Mineral wealth" by John Coggin Brown, Abani Kumar Dey; Page 53];Retrieved 10 Dec 2015</ref>
  
 
Project abandoned in favour of 4 mile Aerial Ropeway connecting to Naginimara on the ABR network.  
 
Project abandoned in favour of 4 mile Aerial Ropeway connecting to Naginimara on the ABR network.  
  
==External Links==
+
== References ==
 
+
<references />
Histories of (Indian)Railway Projects ...up to June 1906  - page 5
 
 
 
https://archive.org/stream/RailwayProjects/Railway%20projects_djvu.txt
 
 
 
 
 
Mineral wealth by John Coggin Brown, Abani Kumar Dey, Abani Kumar De – page 53
 
 
 
https://books.google.co.uk/
 
  
 
[[Category:Tramways]]
 
[[Category:Tramways]]
 
[[Category:Railways]]
 
[[Category:Railways]]
 +
[[Category:Industrial Railways]]

Latest revision as of 09:39, 19 February 2017

Borjan-Suntak Steam Tramway

Proposal in 1906 from the Assam Company for the construction of a steam tramway to convey coal from the coalfield of that Company in the Naga Hills to the Assam-Bengal Railway(ABR) sidings at Suntak in the Sibsagar district. [1][2]

Project abandoned in favour of 4 mile Aerial Ropeway connecting to Naginimara on the ABR network.

References