East Bengal Railway Bridges: Difference between revisions

Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Paragraph added with 1937 Report info
PEA-2292 (talk | contribs)
Internal links added
 
Line 1: Line 1:
'''EBR Bridges '''  
'''Eastern Bengal Railway - Lines owned and worked'''


The '''[[Eastern Bengal Railway]] ''' (EBR) engaged [[Bradford Leslie]] as Resident Engineer from 1858 in-charge of construction of large bridges and viaducts.:-  
<blockquote>- a sub-section of the '''[[Eastern Bengal Railway]]'''(EBR) page</blockquote>
<blockquote>- see also separate page '''[[Eastern Bengal Railway - Lines owned and worked|East Bengal Railway Bridges - Lines owned and worked]]'''</blockquote>
 
[[File:East Bengal Railway System 1937 Map.png|thumb| EBR Railway System  1937 Map]]
 
The '''[[East Bengal Railway]] ''' (EBR) engaged [[Bradford Leslie]] as Resident Engineer from 1858 in-charge of construction of large bridges and viaducts.:-  
[[File: East Bengal Railway Bridges.png|thumb| East Bengal Railway Bridges ]]
[[File: East Bengal Railway Bridges.png|thumb| East Bengal Railway Bridges ]]