Howrah-Delhi EIR Main Line: Difference between revisions

Jump to navigation Jump to search
PEA-2292 (talk | contribs)
New page all checked
 
PEA-2292 (talk | contribs)
Text additions with internal links added
Line 1: Line 1:
'''Howrah-Delhi EIR Main Line'''
'''Howrah-Delhi EIR Main Line'''


The first section [[Howrah]] to [[Hooghly]], 24 miles(38km,) opened 1854; via Khana Junction-[[Bhagalpur]]-[[Jamalpur]]-Luckeeserai-Mogul Sarai to [[Allahabad]], 1865; reaching [[Delhi]] on 1 Jan 1867; 1021 miles(1643km) <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n64/mode/1up “Administration Report on Railways 1918” page 53 (pdf62]; Retrieved  9 Nov 2016</ref>.  
The first section [[Howrah]] to [[Hooghly]], 24 miles(38km,) opened 1854; via Khana Junction-[[Bhagalpur]]-[[Jamalpur]]-Luckeeserai-Mogul Sarai to [[Allahabad]], 1865; reaching [[Delhi]] on 1 Jan 1867; 1021 miles(1643km) <ref name=Admin>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n64/mode/1up “Administration Report on Railways 1918” page 53 (pdf62)]; Retrieved  9 Nov 2016</ref>.  
 
The opening of the [[First Chord EIR Line]] in 1871 between Khana Junction and Luckeeserai reduced the Howrah-Delhi mileage to 943 miles(1517km) <ref name=Admin/>.
 
The Khana Junction-Bhagalpur-Jamalpur-Luckeeserai section became secondary and became designated as the [[Sahibganj Loop EIR Line]] <ref> “Symphony of Progress  - The Saga of the Eastern Railway 1854-2003”; published by Eastern Railway, 2003; page 15</ref>


== Further Information==
== Further Information==