Changes

Jump to navigation Jump to search

Daund-Baramati Railway

477 bytes added, 14:05, 10 December 2015
Data added, links checked, Work-in-progress removed, References added
'''The "Daund-Baramati Railway'''" was a metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) track completed in 1906. This connecting [[Daund]] to [[Baramati]], a distance of 23 miles(37 km) with one intermediate station at Kathphal. The line was worked by the [[Great Indian Peninsula Railway]](GIPR)
Apparantly constucted for GIPR<ref>[http://en. Therefore assumed wikipedia.org/wiki/Daund Wikipedia "Daund"]; Retrieved 10 Dec 2015</ref> <ref>[http://en.wikipedia.org/w/index.php?search=Kutch+Gurjar+Kshatriyas+contributions+to be a State Railway.+the+Indian+railways&title=Special%3ASearch&fulltext=1 Wikipedia "KGK Contributions to the Indian Railways"]; Retrieved 10 Dec 2015</ref>
Metre gauge, worked by GIPR(qv)== References == {{Work-in-Progress-Rly}}<references />
[[Category:Railways]]
[[Category:State Railways]]
9,628
edits

Navigation menu