Sind-Sagar Railway: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
Fully checked; Further Info added with link |
||
| Line 32: | Line 32: | ||
Originally constructed to metre gauge, the '''Sind-Sagar Railway''' was later converted to broad gauge. In 1886 the eastern section of the was amlagamted with other railways to form the [[North-Western State Railway]]. | Originally constructed to metre gauge, the '''Sind-Sagar Railway''' was later converted to broad gauge. In 1886 the eastern section of the was amlagamted with other railways to form the [[North-Western State Railway]]. | ||
==Further Information== | |||
See '''[[North-Western State Railway]]''' | |||
[[Category:Railways]] | [[Category:Railways]] | ||
[[Category:State Railways]] | [[Category:State Railways]] | ||
Revision as of 07:57, 13 February 2016
| Sind-Sagar Railway | ||
|---|---|---|
| [[Image:|150px| ]] | ||
| Line of route | ||
| Gauge / mileage | ||
| Timeline | ||
| Key locations | ||
| Presidency | ||
| Stations | ||
| System agency | ||
| How to interpret this infobox | ||
Originally constructed to metre gauge, the Sind-Sagar Railway was later converted to broad gauge. In 1886 the eastern section of the was amlagamted with other railways to form the North-Western State Railway.