Simla Hydroelectric Scheme Construction Monorail

From FIBIwiki
Revision as of 06:31, 6 March 2017 by PEA-2292 (talk | contribs)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Simla Hydroelectric Scheme Construction Monorail

A hydroelectic scheme was built by 'Marsland, Price & Company' on the Nauti Khud Stream, 14 miles(22km) from Simla to provide electricity to Simla. It was constructed between 1908 and 1912 [1].

A Ewing type monorail system must have been used during the construction. In the 6 Jul 1912 edition of 'Indian Engineering' the company advertised a number of Ewing monorail trucks for sale among the surplus material from the project [1]

References

  1. 1.0 1.1 “Industrial Railways and Locomotives of India and South Asia” compiled by Simon Darvill. Published by ‘The Industrial Railway Society’ 2013. ISBN 978 1 901556 82-7. Available at http://irsshop.co.uk/India. Reference: Entry HP04 page 163