Difference between revisions of "Bahawalnagar-Fort Abbas Railway"
Jump to navigation
Jump to search
(Full revision all checked; IRFCA deleted; Wikipedia moved to' References') |
(Info added with links tested OK) |
||
Line 1: | Line 1: | ||
− | + | {{Line Railways Infobox | |
+ | |image= | ||
+ | |caption= | ||
+ | |route= [[Bahawalnagar]] to [[Fort Abbas]] | ||
+ | |gauge1= Broad gauge | ||
+ | |gauge1details= 70 miles | ||
+ | |gauge2= | ||
+ | |gauge2details= | ||
+ | |gauge3= | ||
+ | |gauge3details= | ||
+ | |gauge4= | ||
+ | |gauge4details= | ||
+ | |timeline1date= 1928 | ||
+ | |timeline1details= Line opened | ||
+ | |timeline2date= | ||
+ | |timeline2details= | ||
+ | |timeline3date= | ||
+ | |timeline3details= | ||
+ | |timeline4date= | ||
+ | |timeline4details= | ||
+ | |timeline5date= | ||
+ | |timeline5details= | ||
+ | |presidency= | ||
+ | |stations= [[Bahawalnagar]], [[Fort Abbas]] | ||
+ | |system1date= | ||
+ | |system1details= Worked by [[North Western Railway]] | ||
+ | |system2date= | ||
+ | |system2details= | ||
+ | |system3date= | ||
+ | |system3details= | ||
+ | }} | ||
− | + | The '''Bahawalnagar-Fort Abbas Railway''' was a Darbar line financed by the [[Princely states|Princely ]][[Bahawalpur State]]. The line opened in 1928 and was worked by [[North Western Railway]](NWR) <ref name=name>[https://en.wikipedia.org/wiki/Abandoned_and_dismantled_railway_lines_in_Pakistan Wikipedia "Abandoned and dismantled railway lines in Pakistan"]; Retrieved 29 Jan 2016</ref> | |
− | <ref name=name>[https://en.wikipedia.org/wiki/Abandoned_and_dismantled_railway_lines_in_Pakistan Wikipedia "Abandoned and dismantled railway lines in Pakistan"]; Retrieved 29 Jan 2016</ref> | ||
− | |||
− | The line linked [[Bahawalnagar]] with [[Fort Abbas]]. Owned by [[Bahawalpur State]] Darbar who also owned the [[Khanpur-Chachran Railway]]. | + | The line linked [[Bahawalnagar]] with [[Fort Abbas]], a line length of 70miles (112km). Owned by [[Bahawalpur State]] Darbar, who also owned the [[Khanpur-Chachran Railway]], and formed an important part of the NWR network. |
− | Transferred to [[Pakistan]] | + | Transferred to [[Pakistan]] following independence and subsequently dismantled<ref name=name/>. |
== References == | == References == |
Revision as of 16:45, 18 February 2016
Bahawalnagar-Fort Abbas Railway | ||
---|---|---|
[[Image:|150px| ]] | ||
Line of route | ||
Bahawalnagar to Fort Abbas | ||
Gauge / mileage | ||
Broad gauge | 70 miles | |
Timeline | ||
1928 | Line opened | |
Key locations | ||
Presidency | ||
Stations | Bahawalnagar, Fort Abbas | |
System agency | ||
Worked by North Western Railway | ||
How to interpret this infobox |
The Bahawalnagar-Fort Abbas Railway was a Darbar line financed by the Princely Bahawalpur State. The line opened in 1928 and was worked by North Western Railway(NWR) [1]
The line linked Bahawalnagar with Fort Abbas, a line length of 70miles (112km). Owned by Bahawalpur State Darbar, who also owned the Khanpur-Chachran Railway, and formed an important part of the NWR network.
Transferred to Pakistan following independence and subsequently dismantled[1].
References
- ↑ 1.0 1.1 Wikipedia "Abandoned and dismantled railway lines in Pakistan"; Retrieved 29 Jan 2016