Difference between revisions of "Borjan-Suntak Steam Tramway"

From FIBIwiki
Jump to navigation Jump to search
(Created page with "{{Work-in-Progress-Rly}} Category:Tramways Category:Railways")
 
(Data added, links checked, Work-in-progress removed)
Line 1: Line 1:
{{Work-in-Progress-Rly}}
+
'''Borjan-Suntak Steam Tramway'''
 +
 
 +
Proposal  in 1906 from the Assam Company for the construction of a steam tramway to convey coal from the coalfield of that Company in the Naga Hills to the [[Assam-Bengal Railway]](ABR) sidings at Suntak in the Sibsagar district.
 +
 
 +
Project abandoned in favour of 4 mile Aerial Ropeway connecting to Naginimara on the ABR network.
 +
 
 +
==External Links==
 +
 
 +
Histories of (Indian)Railway Projects ...up to June 1906  - page 5
 +
 
 +
https://archive.org/stream/RailwayProjects/Railway%20projects_djvu.txt
 +
 
 +
 
 +
Mineral wealth by John Coggin Brown, Abani Kumar Dey, Abani Kumar De – page 53
 +
 
 +
https://books.google.co.uk/
  
 
[[Category:Tramways]]
 
[[Category:Tramways]]
 
[[Category:Railways]]
 
[[Category:Railways]]

Revision as of 04:08, 12 November 2015

Borjan-Suntak Steam Tramway

Proposal in 1906 from the Assam Company for the construction of a steam tramway to convey coal from the coalfield of that Company in the Naga Hills to the Assam-Bengal Railway(ABR) sidings at Suntak in the Sibsagar district.

Project abandoned in favour of 4 mile Aerial Ropeway connecting to Naginimara on the ABR network.

External Links

Histories of (Indian)Railway Projects ...up to June 1906 - page 5

https://archive.org/stream/RailwayProjects/Railway%20projects_djvu.txt


Mineral wealth by John Coggin Brown, Abani Kumar Dey, Abani Kumar De – page 53

https://books.google.co.uk/