Difference between revisions of "Borjan-Suntak Steam Tramway"
Jump to navigation
Jump to search
(Created page with "{{Work-in-Progress-Rly}} Category:Tramways Category:Railways") |
(Data added, links checked, Work-in-progress removed) |
||
Line 1: | Line 1: | ||
− | + | '''Borjan-Suntak Steam Tramway''' | |
+ | |||
+ | Proposal in 1906 from the Assam Company for the construction of a steam tramway to convey coal from the coalfield of that Company in the Naga Hills to the [[Assam-Bengal Railway]](ABR) sidings at Suntak in the Sibsagar district. | ||
+ | |||
+ | Project abandoned in favour of 4 mile Aerial Ropeway connecting to Naginimara on the ABR network. | ||
+ | |||
+ | ==External Links== | ||
+ | |||
+ | Histories of (Indian)Railway Projects ...up to June 1906 - page 5 | ||
+ | |||
+ | https://archive.org/stream/RailwayProjects/Railway%20projects_djvu.txt | ||
+ | |||
+ | |||
+ | Mineral wealth by John Coggin Brown, Abani Kumar Dey, Abani Kumar De – page 53 | ||
+ | |||
+ | https://books.google.co.uk/ | ||
[[Category:Tramways]] | [[Category:Tramways]] | ||
[[Category:Railways]] | [[Category:Railways]] |
Revision as of 04:08, 12 November 2015
Borjan-Suntak Steam Tramway
Proposal in 1906 from the Assam Company for the construction of a steam tramway to convey coal from the coalfield of that Company in the Naga Hills to the Assam-Bengal Railway(ABR) sidings at Suntak in the Sibsagar district.
Project abandoned in favour of 4 mile Aerial Ropeway connecting to Naginimara on the ABR network.
External Links
Histories of (Indian)Railway Projects ...up to June 1906 - page 5
https://archive.org/stream/RailwayProjects/Railway%20projects_djvu.txt
Mineral wealth by John Coggin Brown, Abani Kumar Dey, Abani Kumar De – page 53