Difference between revisions of "Cawnpore-Barabanki Railway"

From FIBIwiki
Jump to navigation Jump to search
(References replacing External Links)
(Wikipedia Reference moved to External Links to confirm to specified format)
Line 3: Line 3:
  
 
The Cawnpore-Barabanki Railway was essentially the common stem of the B&NWR and the R&KR networks. The Cawnpore-Barabanki Railway was transferred to the North Eastern Railway on 27 February 1953.
 
The Cawnpore-Barabanki Railway was essentially the common stem of the B&NWR and the R&KR networks. The Cawnpore-Barabanki Railway was transferred to the North Eastern Railway on 27 February 1953.
<ref>[https://en.wikipedia.org/wiki/Cawnpore-Barabanki_Railway Wikipedia "Cawnpore-Barabanki Railway"]; Retrieved 10 Dec 2015</ref>
 
 
<ref>[https://indianrailwaynotes.files.wordpress.com/2010/07/north-eastern-railway.pdf  "Indian Railway Line History" page 11 by Keith Scholey]; Retrieved 10 Dec 2015</ref>
 
<ref>[https://indianrailwaynotes.files.wordpress.com/2010/07/north-eastern-railway.pdf  "Indian Railway Line History" page 11 by Keith Scholey]; Retrieved 10 Dec 2015</ref>
  
Line 12: Line 11:
 
*Daliganj-Barabanki line (Metre gauge: 18 miles).Daliganj (R&K) to Barabanki (BNW) (18 miles) opened 24 November 1896
 
*Daliganj-Barabanki line (Metre gauge: 18 miles).Daliganj (R&K) to Barabanki (BNW) (18 miles) opened 24 November 1896
  
 
+
==External Links==
 +
*https://en.wikipedia.org/wiki/Cawnpore-Barabanki_Railway  "Cawnpore-Barabanki Railway"] Wikipedia
  
 
== References ==
 
== References ==

Revision as of 06:33, 10 January 2016

The Cawnpore-Barabanki Railway was owned by the Government of India(GoI) and managed as part of the East Indian Railway(EIR), and was worked by the Bengal and North-Western Railway(B&NWR) and the Rohilkund and Kumaon Railway(R&KR) and their successors.

The Cawnpore-Barabanki Railway was essentially the common stem of the B&NWR and the R&KR networks. The Cawnpore-Barabanki Railway was transferred to the North Eastern Railway on 27 February 1953. [1]

There were two lines:

  • Cawnpore-Aishbagh line (Metre gauge: 45 miles). Cawnpore (BBCI) to Aishbagh (R&KR) (45 miles) opened between 25 April and 15 May 1897. Part of this section was originally named the Cawnpore-Burhwal Railway (Metre Gauge Link), an existing branch of the O&RR to which a third rail was added, creating a short, mixed-gauge link.
  • Daliganj-Barabanki line (Metre gauge: 18 miles).Daliganj (R&K) to Barabanki (BNW) (18 miles) opened 24 November 1896

External Links

References