Daund-Baramati Railway

From FIBIwiki
Revision as of 07:23, 10 January 2016 by PEA-2292 (talk | contribs) (Wikipedia Reference moved to External Links to confirm to specified format)
Jump to navigation Jump to search

The "Daund-Baramati Railway" was a metre gauge(MG) track completed in 1906. This connecting Daund to Baramati, a distance of 23 miles(37 km) with one intermediate station at Kathphal. The line was worked by the Great Indian Peninsula Railway(GIPR)

External Links