The '''Indian Branch Railway''' (IBR) was formed in 1862 to construct short branches and feeder lines in northern India, with a 20-year subsidy from the Government of India([[Government of India |GoI]]) but no guarantee.  
 
The '''Indian Branch Railway''' (IBR) was formed in 1862 to construct short branches and feeder lines in northern India, with a 20-year subsidy from the Government of India([[Government of India |GoI]]) but no guarantee.  
  
 +
== History ==
  
== Characteristics ==
+
In 1863, the IBR built the [[Nalhati-Azimganj Railway]], a  unique 4ft(1222mm) rail gauge. See [[Rail_gauge]]
  
In 1863, the IBR built the 4' gauge Nalhati-Azimganj line. In 1866, it began construction of a metre gauge line between Lucknow-Kanpur, completed the following year. Without a guaranteed return from the Government of India([[Government of India |GoI]]), the IBR found it impossible to continue and in 1867, secured a new contract from the [[Government of India |GoI]] on terms similar to those on offer in the 1850s i.e. a guaranteed return on capital employed.  Subsequently, the IBR was subsumed into the [[Oudh and Rohilkhand Railway]](O&RR).
+
In 1866, it began construction of a Metre Gauge([[Rail_#Metre_Gauge|MG]]) line between Lucknow-Kanpur, completed the following year. Without a guaranteed return from the Government of India([[Government of India |GoI]]), the IBR found it impossible to continue and in 1867, secured a new contract from the [[Government of India |GoI]] on terms similar to those on offer in the 1850s i.e. a guaranteed return on capital employed.   
  
 +
Subsequently, the IBR was subsumed into the [[Oudh and Rohilkhand Railway]](O&RR).
  
 
== Records ==
 
== Records ==

Revision as of 10:33, 17 September 2015

The Indian Branch Railway (IBR) was formed in 1862 to construct short branches and feeder lines in northern India, with a 20-year subsidy from the Government of India(GoI) but no guarantee.

History

In 1863, the IBR built the Nalhati-Azimganj Railway, a unique 4ft(1222mm) rail gauge. See Rail_gauge

In 1866, it began construction of a Metre Gauge(MG) line between Lucknow-Kanpur, completed the following year. Without a guaranteed return from the Government of India(GoI), the IBR found it impossible to continue and in 1867, secured a new contract from the GoI on terms similar to those on offer in the 1850s i.e. a guaranteed return on capital employed.

Subsequently, the IBR was subsumed into the Oudh and Rohilkhand Railway(O&RR).

Records

Unfortunately, there are no IBR staff records held in the India Office Records at the British Library.