Difference between revisions of "Indian Branch Railway"

From FIBIwiki
Jump to navigation Jump to search
(New category added)
(System abbreviations corrected/added , GoI link added)
Line 1: Line 1:
The '''Indian Branch Railway''' (IBR) was formed in 1862 to construct short branches and feeder lines in northern India, with a 20-year subsidy from the Government of India but no guarantee.  
+
The '''Indian Branch Railway''' (IBR) was formed in 1862 to construct short branches and feeder lines in northern India, with a 20-year subsidy from the Government of India([[Government of India |GoI]]) but no guarantee.  
  
  
 
== Characteristics ==
 
== Characteristics ==
  
In 1863, the IBR built the 4' gauge Nalhati-Azimganj line. In 1866, it began construction of a metre gauge line between Lucknow-Kanpur, completed the following year. Without a guaranteed return from the GoI, the IBR found it impossible to continue and in 1867, secured a new contract from the GoI on terms similar to those on offer in the 1850s i.e. a guaranteed return on capital employed.  Subsequently, the IBR was subsumed into the [[Oudh and Rohilkhand Railway]].
+
In 1863, the IBR built the 4' gauge Nalhati-Azimganj line. In 1866, it began construction of a metre gauge line between Lucknow-Kanpur, completed the following year. Without a guaranteed return from the Government of India([[Government of India |GoI]]), the IBR found it impossible to continue and in 1867, secured a new contract from the [[Government of India |GoI]] on terms similar to those on offer in the 1850s i.e. a guaranteed return on capital employed.  Subsequently, the IBR was subsumed into the [[Oudh and Rohilkhand Railway]](O&RR).
  
  

Revision as of 07:33, 17 September 2015

The Indian Branch Railway (IBR) was formed in 1862 to construct short branches and feeder lines in northern India, with a 20-year subsidy from the Government of India(GoI) but no guarantee.


Characteristics

In 1863, the IBR built the 4' gauge Nalhati-Azimganj line. In 1866, it began construction of a metre gauge line between Lucknow-Kanpur, completed the following year. Without a guaranteed return from the Government of India(GoI), the IBR found it impossible to continue and in 1867, secured a new contract from the GoI on terms similar to those on offer in the 1850s i.e. a guaranteed return on capital employed. Subsequently, the IBR was subsumed into the Oudh and Rohilkhand Railway(O&RR).


Records

Unfortunately, there are no IBR staff records held in the India Office Records at the British Library.