Changes

Jump to navigation Jump to search

Jodhpur-Bikaner Railway

629 bytes added, 16:36, 23 September 2015
Two new 'Contents' pages added - data added, links checked
In 1924, the JBR was split into its two constituent parts, with two new systems, the [[Jodhpur State Railway|Jodhpur]] and [[Bikhaner State Railway|Bikhaner State Railways]], formed to work the lines.
 
==JBR Lines and extensions==
*[[Mirpur Khas-Jhudo Railway]], opened 1909 as a section of JBR; then by JSR.
*[[Mirpur Khas-Khadro Railway]], opened 1912 as a section of JBR; then by JSR.
 
==Lines worked by JBR at some time==
*[[Hyderabad-Umarkot Railway]]; surveyed 1890. Section opened 1892 as part of [[Jodhpur-Hyderabad Railway]] (British Section). Worked by JBR until 1924; then by JSR.
*[[Jodhpur-Hyderabad Railway]] (British Section). Fully opened 1901. Worked by JBR until 1924; then by JSR.
*[[Pipar Road-Ravi Light Railway]], opened 1910 as part of [[Pipar-Bilara Light Railway]]. Worked by JBR, 1910; then JSR, 1924
[[Category:Railways]]
[[Category:Indian States Railways]]
9,628
edits

Navigation menu