Difference between revisions of "Mymensingh-Bhairab Bazar Railway"

From FIBIwiki
Jump to navigation Jump to search
(Full revision all checked ( Records & IOR reference added))
(Fully checked; 1918 Admin Report link changed; "Further Information" added with link)
 
Line 1: Line 1:
 
The '''Mymensingh–Bhairab Bazar''' Railway Company constructed this line between 1912 and opened in stages in 1912-18. The metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) line was worked by the [[Assam Bengal Railway]]  (ABR).
 
The '''Mymensingh–Bhairab Bazar''' Railway Company constructed this line between 1912 and opened in stages in 1912-18. The metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) line was worked by the [[Assam Bengal Railway]]  (ABR).
 
<ref name=name>[http://en.wikipedia.org/wiki/Tongi%E2%80%93Bhairab%E2%80%93Akhaura_line Wikipedia "Tongi–Bhairab–Akhaura line". Para. Bhairab Bazar–Kishoreganj–Gouripur–Mymensingh line]; Retrieved 13 Dec 2015</ref>
 
<ref name=name>[http://en.wikipedia.org/wiki/Tongi%E2%80%93Bhairab%E2%80%93Akhaura_line Wikipedia "Tongi–Bhairab–Akhaura line". Para. Bhairab Bazar–Kishoreganj–Gouripur–Mymensingh line]; Retrieved 13 Dec 2015</ref>
<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n163/mode/2up " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 155]; Retrieved 19 Dec 2015</ref>
+
<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n163/mode/2up " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 155]; Retrieved 9 Feb 2016</ref>
  
 
The line joined [[Mymensingh]]–Gouripur–Kishoreganj-[[Bhairab Bazar]] and covers the northern bank of the of the Brahmaputra River. The line length was 101 miles (161Km).
 
The line joined [[Mymensingh]]–Gouripur–Kishoreganj-[[Bhairab Bazar]] and covers the northern bank of the of the Brahmaputra River. The line length was 101 miles (161Km).
Line 15: Line 15:
 
*'''L/F/8/20/1675'''  “ Mymensingh-Bhairab Bazar Railway, Contract for construction, maintenance and working of a railway; 1922"  
 
*'''L/F/8/20/1675'''  “ Mymensingh-Bhairab Bazar Railway, Contract for construction, maintenance and working of a railway; 1922"  
 
*'''L/F/8/20/1702'''  “ Mymensingh-Bhairab Bazar Railway Company Limited and Assam-Bengal Railway Company Limited, Contract for working, maintenance and management of the Mymensingh-Bhairab Bazar Railway. Plus addendum and corrigendum to contracts dated 7th November 1922; 1924"  
 
*'''L/F/8/20/1702'''  “ Mymensingh-Bhairab Bazar Railway Company Limited and Assam-Bengal Railway Company Limited, Contract for working, maintenance and management of the Mymensingh-Bhairab Bazar Railway. Plus addendum and corrigendum to contracts dated 7th November 1922; 1924"  
 +
 +
==Further Information==
 +
See '''[[Assam Bengal Railway]]'''
  
 
== References ==
 
== References ==

Latest revision as of 11:46, 9 February 2016

The Mymensingh–Bhairab Bazar Railway Company constructed this line between 1912 and opened in stages in 1912-18. The metre gauge(MG) line was worked by the Assam Bengal Railway (ABR). [1] [2]

The line joined Mymensingh–Gouripur–Kishoreganj-Bhairab Bazar and covers the northern bank of the of the Brahmaputra River. The line length was 101 miles (161Km).

The Company was acquired by the government in 1948–49 and the Assam Bengal Railway Company was in charge of the management of the line. There are two lines branching out of this line – a short Shyamganj-Jaria Janjail Line and a long Gouripur-Netrokona-Mohanganj Line. [1]

Records

Refer to FIBIS Fact File #4: “Research sources for Indian Railways, 1845-1947” - available from the Fibis shop. This Fact File contains invaluable advice on 'Researching ancestors in the UK records of Indian Railways' with particular reference to the India Office Records (IOR) held at the British Library

An on-line search of the IOR records relating to this railway [3] gives the following: -

  • L/F/8/20/1675 “ Mymensingh-Bhairab Bazar Railway, Contract for construction, maintenance and working of a railway; 1922"
  • L/F/8/20/1702 “ Mymensingh-Bhairab Bazar Railway Company Limited and Assam-Bengal Railway Company Limited, Contract for working, maintenance and management of the Mymensingh-Bhairab Bazar Railway. Plus addendum and corrigendum to contracts dated 7th November 1922; 1924"

Further Information

See Assam Bengal Railway

References