Difference between revisions of "Nadiad-Kapadvanj Railway"

From FIBIwiki
Jump to navigation Jump to search
(Data added, links checked, Work-in-progress removed)
(Data added, links checked)
Line 1: Line 1:
The '''Nadiad-Kapadvanj Railway''' railway opened 1913.
+
The '''Nadiad-Kapadvanj Railway''' opened in 1913, a length of 28 miles(45m) and served from [[Nadiad]].
  
 
The railway was owned and managed by the [[Gujarat Railway Company]]. The company was taken over by the [[Bombay, Baroda and Central India Railway]](BB&CIR) in  1922
 
The railway was owned and managed by the [[Gujarat Railway Company]]. The company was taken over by the [[Bombay, Baroda and Central India Railway]](BB&CIR) in  1922
 +
 +
==External Links==
 +
*[http://www.irfca.org/articles/isrs/isrs082004-steam-history.html IRFCA Steam History – Gujarat Lines
 +
*[http://dspace.gipe.ac.in/xmlui/bitstream/handle/10973/18185/GIPE-015962.pdf?sequence=3&isAllowed=y  Railways in India – GOI Administritive Report 1916-17] 
  
  
 
[[Category:Railways]]
 
[[Category:Railways]]
 
[[Category:Private Railways]]
 
[[Category:Private Railways]]

Revision as of 14:24, 20 November 2015

The Nadiad-Kapadvanj Railway opened in 1913, a length of 28 miles(45m) and served from Nadiad.

The railway was owned and managed by the Gujarat Railway Company. The company was taken over by the Bombay, Baroda and Central India Railway(BB&CIR) in 1922

External Links