Difference between revisions of "Punjab Northern State Railway"
Jump to navigation
Jump to search
HughWilding (talk | contribs) m |
m |
||
(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
− | + | The '''Punjab Northern State Railway'''(PNSR) was formed between 1870 and 1871 to run from [[Lahore]] to [[Peshawar]]. | |
− | + | Temporary line, opened c.1875 | |
− | The '''Punjab Northern State Railway''' was formed between 1870 and 1871 to run from [[Lahore]] to [[Peshawar]]. | ||
− | |||
== Characteristics == | == Characteristics == | ||
− | With others, the Punjab Northern State Railway was merged with the [[Sind, Punjab and Delhi Railway]] in 1886 to form the ''North-Western State Railway'' (later the [[North Western Railway]]). | + | With others, the Punjab Northern State Railway was merged with the [[Sind, Punjab and Delhi Railway]] in 1886 to form the '''North-Western State Railway''' (later the [[North Western Railway]]). |
Line 17: | Line 15: | ||
[http://gwydir.demon.co.uk/jo/genealogy/dibblee/index.htm Frederick Dibblee, MICE], Engineer-in-Chief, later Superintending Engineer, PNSR (1879-1880). | [http://gwydir.demon.co.uk/jo/genealogy/dibblee/index.htm Frederick Dibblee, MICE], Engineer-in-Chief, later Superintending Engineer, PNSR (1879-1880). | ||
+ | |||
+ | [[Category:Railways]] | ||
+ | [[Category:Indian States Railways]] |
Revision as of 10:57, 27 September 2015
The Punjab Northern State Railway(PNSR) was formed between 1870 and 1871 to run from Lahore to Peshawar. Temporary line, opened c.1875
Characteristics
With others, the Punjab Northern State Railway was merged with the Sind, Punjab and Delhi Railway in 1886 to form the North-Western State Railway (later the North Western Railway).
Records
There are no PNSR Staff agreements held at the British Library in the India Office Records.
External links
Frederick Dibblee, MICE, Engineer-in-Chief, later Superintending Engineer, PNSR (1879-1880).