Difference between revisions of "Purulia Ranchi Light Railway"

From FIBIwiki
Jump to navigation Jump to search
(1918 Admin Report details checked/added/corrected)
(Fully checked; Further Info added with link and minor edits)
 
Line 1: Line 1:
The '''Purulia Ranchi Light Railway''' was a 2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) branch of the [[Bengal-Nagpur Railway]] - later [[South Eastern Railway]]. It was opened by Sir Andrew Fraser, Lieutenant Governor of Bengal on 14th November 1907 <ref> "Bihar District Gazetteer" Volume 16 </ref>.
+
The '''Purulia Ranchi Light Railway''' was a 2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) branch of the [[Bengal-Nagpur Railway]].It was opened by Sir Andrew Fraser, Lieutenant Governor of Bengal on 14th November 1907 <ref> "Bihar District Gazetteer" Volume 16 </ref>.
  
 
The first section of the railway from [[Purulia]] to [[Ranchi]], a line length of 73 miles(117 km). Previous to this [[Ranchi]] had been about 70 miles from a station.
 
The first section of the railway from [[Purulia]] to [[Ranchi]], a line length of 73 miles(117 km). Previous to this [[Ranchi]] had been about 70 miles from a station.
Line 5: Line 5:
 
<ref>[https://indianrailwaynotes.files.wordpress.com/2010/07/south-eastern-railway.pdf "Indian Railway Line History" Footnote 10 by Keith Scholey]; Retrieved 13 Dec 2015</ref>
 
<ref>[https://indianrailwaynotes.files.wordpress.com/2010/07/south-eastern-railway.pdf "Indian Railway Line History" Footnote 10 by Keith Scholey]; Retrieved 13 Dec 2015</ref>
  
The track was converted to broad gauge in January 2004.
+
In 1952, the BNR was merged with the East Indian Railway to form Indian Railways' [[Eastern Railway]] but in 1955, BNR re-emerged to form [[South Eastern Railway]]. The track was converted to broad gauge in January 2004.
 +
 
 +
==Further Information==
 +
See '''[[Bengal-Nagpur Railway]]'''
  
 
==References==
 
==References==

Latest revision as of 16:44, 11 February 2016

The Purulia Ranchi Light Railway was a 2ft 6in/762mm narrow gauge(NG) branch of the Bengal-Nagpur Railway.It was opened by Sir Andrew Fraser, Lieutenant Governor of Bengal on 14th November 1907 [1].

The first section of the railway from Purulia to Ranchi, a line length of 73 miles(117 km). Previous to this Ranchi had been about 70 miles from a station. The line was extended to Lohardaga - 42 miles(67km) west of Ranchi in 1913. [2]

In 1952, the BNR was merged with the East Indian Railway to form Indian Railways' Eastern Railway but in 1955, BNR re-emerged to form South Eastern Railway. The track was converted to broad gauge in January 2004.

Further Information

See Bengal-Nagpur Railway

References

  1. "Bihar District Gazetteer" Volume 16
  2. "Indian Railway Line History" Footnote 10 by Keith Scholey; Retrieved 13 Dec 2015