Difference between revisions of "Shahdara-Narowal Railway"

From FIBIwiki
Jump to navigation Jump to search
m
m
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
'''Shahdara-Narowal Railway'''
+
The '''Shahdara-Narowal Railway'''opened in 1926 as part of the [[North Western Railway]](NWR) network.
  
Opened 1926 as part of NWR(qv) network
+
This line was a further broad gauge([[Rail_gauge#Broad_Gauge|BG]]) extension to [[Shahdara]] of the NWR network that had reached [[Narowal]] in 1915 as the [[Sialkot-Narowal Railway]].
  
{{Work-in-Progress-Rly}}
+
==Further Information==
 +
See '''[[North Western Railway]]'''
  
 
[[Category:Railways]]
 
[[Category:Railways]]
 
[[Category:State Railways]]
 
[[Category:State Railways]]

Latest revision as of 16:58, 12 February 2016

The Shahdara-Narowal Railwayopened in 1926 as part of the North Western Railway(NWR) network.

This line was a further broad gauge(BG) extension to Shahdara of the NWR network that had reached Narowal in 1915 as the Sialkot-Narowal Railway.

Further Information

See North Western Railway