Changes

Jump to navigation Jump to search

Bilaspur-Etawa Provincial State Railway

17 bytes added, 09:21, 10 November 2015
m
Tidy External Links & remove circular linking
The section of Katni to Umaria of 37 miles (59km) was built in 1886 and called [[Katni-Umaria Provincial State Railway]] which was absorbed by the [[Bengal Nagpur Railway]](BNR) on 1st January 1888.
This section was incorporated in BNR’s Katni branch when the line from [[Bilaspur]] to [[Katni]] of about 200 miles (320km) was completed in 1891. The line in 1901 was connected with Murwara Junction of [[Great India Peninsula Railway]](GIPR) about half a mile further up from Katni. With this extension the railway track from Bilaspur was connected to [[Etawa]] and as such this line came to be known also by name of '''[[Bilaspur-Etawa Provincial State Railway]]'''.
==External Links==
Indian Railway Line History*[https://indianrailwaynotes.files.wordpress.com/2010/07/south-eastern-railway.pdf Wikipedia - Kutch Gurjar Kshatriyas contributions to the South Eastern Railway]Indian railwaysRailway Notes*[http://en.wikipedia.org/wiki/Kutch_Gurjar_Kshatriyas_contributions_to_the_Indian_railwaysKutch Gurjar Kshatriyas contributions to the Indian railways] wikipedia.org
[[Category:Railways]]
[[Category:Indian States Railways]]
6,297
edits

Navigation menu