Bombay, Baroda & Central India Railway Network - Lines owned and worked

From FIBIwiki
Revision as of 06:18, 5 November 2016 by PEA-2292 (talk | contribs) (Headings created and page layout changed to aid clarity)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Bombay, Baroda & Central India Railway Network - Lines owned and worked

- a sub-section of the Bombay, Baroda and Central India Railway(BB&CIR) page


The Bombay, Baroda and Central India Railway(BB&CIR) owned and operated an extensive network of railways of mixed gauge

  • Broad gauge(BG) - 868 miles/1397km (1905); 997 miles/1604km (1918); 1233 miles/1984km (1943)
  • Metre gauge(MG) - 2022 miles/3254km (1905); 1822 miles/2931km (1918); 1985/3195km miles (1943)
  • Narrow gauge(NG) - 132 miles/212km (1905); 326 miles/523km (1918); 152 miles/245km (1943)

The BB&CIR also managed, worked and maintained a number of mixed gauge lines on behalf of other parties.


The listings below are generally based on the “Administration Report on Railways 1918” [1] with page numbers (and pdf pages) noted at the end of each entry.

In 1918 the total length of line being worked as the BB&CIR system (both owned lines and managed/worked lines) was 3823 miles(6150km) opened plus a further 254 miles(407km) under construction or sanctioned for construction. Page 12 (pdf 21)

BG Lines - owned and operated by BB&CIR

1918 Total - 997 miles(1604km)

  • Bombay-Ahmadabad Main Line; BG line, first section opened 1860, completed 1865 linking Bombay via Surat and Baroda to Ahmedabad, 310 miles(496km); with southerly suburban service extension reaching Bombay Backbay(Colaba) in 1870 and a northerly extension in 1871 to Viramgam, giving a total of 250 miles(560km). Page 13 (pdf 22)
    • Godhra Branch Line; BG line from Ananred 1874, reaching Godhra 1882, 49 miles(79km). Page 13 (pdf 22)
    • Patri Branch Line, also described as the Patri Railway ; BG line opened 1873, 22 miles(35km) from Kharaghoda to Viramgam. Page 13 (pdf 22)
    • Godhra-Baroda Chord; BG line opened 1908, 43 miles(68km) from Godhra to Baroda. Page 13 (pdf 22)
  • Godhra-Rutlam-Nagda Railway Section; BG line from Godhra to Rutlam 1894 and Ratlam-Nagda Railway extension to Nagda 1896; 141 miles(226km). Page 13 (pdf 22)

BG Lines - managed, worked and maintained by BB&CIR

1918 Total 202 miles(325km). Page 12 (pdf 21)

MG Lines - owned and operated by BB&CIR

1918 Total - 1822 miles(2931km). Page 23 (pdf 32)

  • Delhi-Ahmedabad Main Line; MG line, first section, originally named the Rajputana State Railway opened 1873 from Delhi reaching Ahmedabad in 1879, 579 miles(926km); merged to form Rajputana-Malwa State Railway in 1882; becoming in 1900 the MG Ratlam Division of BB○ a further short link to the Ahmedabad-Dholka Railway was added in 1908. Page 22 (pdf 31)
    • Viramgam-Wadhwan Branch Line; MG line 39 miles(62km) from Viramgam to Wadhwan; first opened as BG in 1872 and converted to MG in 1902. Page 22 (pdf 31)
    • Farukhudgar Salt Branch Line; MG line 7.6 miles(11km). Page 22 (pdf 31)
    • Agra MG Branch Line; MG line 94 miles(150km) from Bandikui to Agra Fort; opened 1873-4 and extended to Jamina River, East Bank in 1876. Page 22 (pdf 31)
    • Sambhar Lake Salt Branch Line with extensions; MG line, first section opened 1875 with extension to Japog, Jhowra and Kankaroola; finally 33 miles(53km) in 1891. Page 22 (pdf 31)
  • Malwa Section Main Line; MG line, first section, originally named the Holkar State Railway opened 1874 from Khanwa to Sanawad; linking to the Scindia-Neemuch Railway from Indore reaching Neemuch in 1880; linking to the Neemuch Nasirabad State Railway reaching Nasirababad in 1881 joining to the Nasirabad-Ajmer section that had opened in 1876; total length 392 miles(627km; all these railways merged to form Rajputana-Malwa State Railway in 1882; becoming in 1900 the MG Ratlam Division of BB&CIR. Page 22 (pdf 31)
    • Ujjain Branch Line; MG line, first section 12 miles(19km) opened 1876 from Fatehabad to Ujjain crossing Sipra River to Ujjain City in 1884. Page 22 (pdf 31)
  • Cawnpore-Achnera Main Line; MG line, first section opened 1875 from Muttra as the Mathura-Hathras Provincial Railway; extended linking to Cawnpore by 1884 with connection to Achnera and other minor branches giving total 254 miles(406km) . Page 22 (pdf 31)
  • Rewari-Bhatinda-Fazilka Section; MG line 262 miles(419km) from Rewari to Fazilka, which included the greater part of the Rewari-Ferozepore Railway, opened 1883-5. The Rewari-Phulera Chord 133 miles opened 1905. Page 22 (pdf 31)

MG Lines - managed, worked and maintained by BB&CIR

1908 Total 456 miles(733km)

  • Ahmedabad-Dholka Railway private Company registered 1901; MG line 33 miles(53km) opened 1903 from Saharmati to Dholka; worked as part of BB&CIR network. Pages 24-25 (pdf 33-34)
  • Ahmedabad-Parantij Railway private Company registered 1896 ; MG line 55 miles(88km) opened 1897 from Ahmedabad to Himmatnager; extended to Khul Brahma in 1911 giving total 89 miles(142km); worked as part of BB&CIR network. Pages 25-27 (pdf 34-36)
  • Gaekwar's Mehsana Railway; owned by the Princely Baroda State; MG line 21 miles(34km) opened 1887 from Mehsana to Vadnagar; progressively expanded from 1888 through to 1921 to a total of 193 miles(309km); worked as part of BB&CIR network. Pages 27-29 (pdf 36-38) and from 1921 by GBSR
  • Jaipur State Railway; owned by Jaipur Durbar; MG line 73 miles(117km) from Jaipur to Sawai Madhopu 1905-7 ; further extended from 1916 to a planned 179 miles(286km);and Jaipur to Shaikhawati, 1916; worked as part of BB&CIR network. Pages 29-30 (pdf 38-39)
  • Palanpur-Deesa Railway; jointly owned by the Palanpur Durbar and Government of India(GoI); MG line 17 miles(27km) opened 1893 from Palanpur to Docan; worked as part of BB&CIR network. Pages 31-32 (pdf 40-41)
  • Vijapur-Kalol-Kadi Railway; owned by the Princely Baroda State; MG line of 41 miles(65km) opened 1902-3 from Vijapur to Kadi and extended by a further 5 miles(8km) in 1912 with approval in 1916 for a further 21 miles(34km); worked as part of BB&CIR network. Pages 32-33 (pdf 41-42)

NG 2ft 6in Lines - managed, worked and maintained by BB&CIR

1918 Total - 326 miles(523km). Page 12 (pdf 21)

NG 2ft 6in Railways, worked by BB&CIR

Not listed in 1918 Admin Report

References