Chenab Bridge, Shershar

From FIBIwiki
Revision as of 18:31, 20 May 2016 by PEA-2292 (talk | contribs)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

The Chenab Bridge at Shershar carried the Sind-Sagar Railway Branch of the North Western Railway over the River Chenab.

The 28 span box girder bridge [1] was under construction in 1888 [2] and completed c.1890 [3].

The construction required special civil engineering techniques developed by James Richard Bell of the Public Works Department [4].

The Executive Engineer in 1887 on the project was Robert Trefusis Mallet. [5].

References