Goalundo-Narayanganj Extension Railway Survey

From FIBIwiki
Revision as of 10:33, 1 April 2019 by PEA-2292 (talk | contribs) (References added and text changes)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Goalundo-Narayanganj Extension Railway Survey

The Goalundo-Narayanganj Extension was surveyed by the Eastern Bengal Railway(EBR) during the period 1894-98. The record states “the object of connecting Calcutta with the Assam-Bengal Railway” [1].

This line was not constructed; it involved crossing the River Ganges.

A further survey was undertaken in 1906 to connect this proposed line to the proposed Hajiganj-Shatnal Railway - see separate page [2].
This line also was not constructed.

Even today the railway stops at Goalundo Ghat Station, a short distance from the ferry terminal at Daulatdia crossing to Paturia on the opposite bank of the Ganges.

References