Difference between revisions of "East Indian Railway"

From FIBIwiki
Jump to navigation Jump to search
(Mainly taken from J.N. Westwood, Railways of India (Newton Abbot: David & Charles Ltd, 1974))
 
m (Tidy up to get consistency with the GIPR article)
Line 1: Line 1:
 
[[Category:Railways]]
 
[[Category:Railways]]
[[Image:Giprlogo.jpg|right]]
 
  
Formed in 1845, the East India Railway (EIR) was not contracted by the East India Company to begin raliway construction until 1849, and it was not until 1855 that the EIR opened its first section from Howrah to Hooghly. By 1864, the EIR had arrived in Delhi although it was not until 1871 that the Bombay-Calcutta route was completed when the [[Great India Peninsula Railway]] (GIPR) reached Allahabad.
+
Formed in 1845, the East India Railway (EIR) was not contracted by the East India Company to begin raliway construction until 1849, and it was not until 1855 that the EIR opened its first section from [[Howrah]] to [[Hooghly]]. By 1864, the EIR had arrived in Delhi although it was not until 1871 that the Bombay-Calcutta route was completed when the [[Great India Peninsula Railway]] (GIPR) reached [[Allahabad]].
  
 
Built on the same terms and conditions as the GIPR, the EIR was a British company, registered in London, privately owned and financed, operating under license and guarantee from the (British) Board of Control in India.
 
Built on the same terms and conditions as the GIPR, the EIR was a British company, registered in London, privately owned and financed, operating under license and guarantee from the (British) Board of Control in India.

Revision as of 02:14, 18 November 2008


Formed in 1845, the East India Railway (EIR) was not contracted by the East India Company to begin raliway construction until 1849, and it was not until 1855 that the EIR opened its first section from Howrah to Hooghly. By 1864, the EIR had arrived in Delhi although it was not until 1871 that the Bombay-Calcutta route was completed when the Great India Peninsula Railway (GIPR) reached Allahabad.

Built on the same terms and conditions as the GIPR, the EIR was a British company, registered in London, privately owned and financed, operating under license and guarantee from the (British) Board of Control in India.


Records

Staff agreements from 1881-1925 and index to appontments made in the United Kingdom from 1848-1880 are held in the India Office Records at the British Library.

  • L/AG/46/11/133-137 : Contracts of appointment, c1858-1925 (possibly not all included)

The above is indexed in

  • Z/L/AG/46 : Index to UK Appointments to Indian Railways (1849-1925)

The following is not included in the index Z/L/AG/46.

  • L/AG/46/11/138-141 : Half-yearly staff lists, 1861-1890 & 1911-1922 (giving ages from 1886)


External Links

East India Railway logo

Science & Society Picture Library