Gaekwar's Mehsana Railway

From FIBIwiki
Revision as of 11:19, 15 June 2019 by PEA-2292 (talk | contribs) (Revised ‘Developments after 1918’ sub heading and ‘Further Informatio’ added)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Gaekwar's Mehsana Railway
[[Image:|150px| ]]
Line of route
Viramgam-Mehsana-Taranga Hill
Kakosi extension
Harij branch
Bechraji extension
Gauge / mileage
Metre gauge 162 miles (1918)
193 miles (1921)
Timeline
1887 Mar Mehsana-Vadnagar section opened, extended to Kherain,1888; Viramgam,1891 and Taranga Hill,1909
1891 Jul Mehsana-Patan section opened; extended to Wagrod,1915 and Kakosi,1916
1908 Oct Harji branch and Bechraji extension opened
after 1918 further extensions
Key locations
Presidency Bombay
Stations Viramgam, Mehsana, Vadnagar etc
System agency
1897 Worked by Bombay, Baroda and Central India Railway
1921 Worked by Gaekwar's Baroda State Railway
How to interpret this infobox
Gaekwar's Mehsana Railway

The Gaekwar’s Mehsana Railway (GMR) was owned by the Princely Baroda State. The metre gauge(MG) railway first opened in 1887 with the line from Mehsana to Vadnagar a distance of 21 miles (34km).

The network was progressively expanded from 1888 through to 1921 to a total of 193 miles(309km). [1] [2]

In 1904 the Vadnagar-Vijapur line was surveyed by the Bombay, Baroda and Central India Railway(BB&CIR) as a MG line but did not proceed. Instead the Baroda Durbar resurveyed the route on a different alignment entirely within Baroda territory. The 1906 Report states that “the line from either Visnager or Vadnagar to Vijapur was to be constructed at the expense of the the Gaekwar of Baroda” [3] In the event neither route was selected, instead the ‘Vijapur-Kalol-Kadi Railway’ was constructed. See below, marked 8 on 1931 map

Up to 1921 the network was worked by Bombay, Baroda and Central India Railway(BB&CIR).

From 1921 the network was worked by Gaekwar's Baroda State Railway(GBSR)

GMR Network

Development as at 1918 [4]

  • ‘Mehsana-Taranga Hill Section’, from Mehsana to Vadnagar 21 miles opened 1887; extended to Kheralu 7 miles 1888; to Taranga Hill 8 miles 1909. Total 36 miles(58km). Marked 1 on map
  • ‘Mehsana-Viramgam Section’, from Mehsana to Viramgam 40 miles(64km) opened 1891. Marked 2 on map
  • ‘Mehsana-Kakoshi Section’ from Mehsana to Patan 25 miles(40km), opened 1891; extended to Vagrod 15 miles 1915; to Kakoshi 10 miles 1916. Total 50miles(80km). Marked 3 on map
  • ‘Harij Branch’ from Manund Road to Harij 21 miles(34km) opened 1908. Marked 4 on map
  • ‘Bechargi Extension’ from Chanama to Bechraji 17 miles(27km) opened 1908. Marked 5 on map
  • ‘Vagrod-Khareda Branch’ from Vagrod to Khareda 12 miles(19km), sanctioned 1913. Marked 6 on 1931 map, but opening date not found and not seen on modern maps
  • ‘Khalipur to Khakhal Proposal’ 7 miles(11km), sanctioned 1913. Line apparently not constructed .

'Developments after 1918 [5]
The following MG railway, also owned by the Baroda Durbar, was connected to the GMR by 1921, and worked by the Bombay, Baroda and Central India Railway(BB&CIR).
This line together with the GMR was transferred to the newly formed ‘Gaekwar's Baroda State Railway’(GBSR) in 1921:-

Further Information=

See BB&CIR Network - Lines owned and worked for period up to 1921
and Gaekwar's Baroda State Railway# GBSR Metre Gauge System from 1921 onwards

References