Difference between revisions of "Ghaziabad-Lahore Railway"

From FIBIwiki
Jump to navigation Jump to search
(new page)
 
(NWR ‘Ghaziabad to Lahore Mainline’ and See Also link added)
Line 2: Line 2:
  
 
In 1886 became the ‘Ghaziabad to Lahore Section’ of the NWR
 
In 1886 became the ‘Ghaziabad to Lahore Section’ of the NWR
 +
 +
==NWR ‘Ghaziabad to Lahore Mainline’==
 +
The section of the NWR mainline 339 miles(546km), was part of the [[Scinde, Punjaub & Delhi Railway]]( SP&DR) until amalgamation into NWR in 1886,.  The line had been constructed in stages from [[Lahore]] to [[Amritsar]] in 1862 and via [[Jullunder]], [[Ludiana]], [[Ambala]], and [[Meerut]] to [[Ghaziabad]] completed by 1870.
 +
**[[Amritsar-Pathankot  Railway| ‘Pathankot Branch Line’]], 67 miles(107km), a branch from [[Amritsar]] via Dinanager to [[Pathankot]], opened  1884 by SP&DR, became NWR from 1886.
 +
 +
''See also''  '''North Western Railway - Lines operated and worked '''
  
 
[[Category:Railways]]
 
[[Category:Railways]]
 
[[Category:State Railways]]
 
[[Category:State Railways]]

Revision as of 14:30, 6 April 2020

The Ghaziabad-Lahore Railway, 339 miles(546km), was part of the Scinde, Punjaub & Delhi Railway( SP&DR) until amalgamation into North Western Railway(NWR) in 1886,. The line had been constructed in stages from Lahore to Amritsar in 1862 and via Jullunder, Ludiana, Ambala, and Meerut to Ghaziabad completed by 1870.

In 1886 became the ‘Ghaziabad to Lahore Section’ of the NWR

NWR ‘Ghaziabad to Lahore Mainline’

The section of the NWR mainline 339 miles(546km), was part of the Scinde, Punjaub & Delhi Railway( SP&DR) until amalgamation into NWR in 1886,. The line had been constructed in stages from Lahore to Amritsar in 1862 and via Jullunder, Ludiana, Ambala, and Meerut to Ghaziabad completed by 1870.

See also North Western Railway - Lines operated and worked