Difference between revisions of "Gwalior Light Railway"

From FIBIwiki
Jump to navigation Jump to search
(Complete rewrite with Links References, etc)
(Map added ==Early History== added Internal location links added)
Line 2: Line 2:
 
|image=
 
|image=
 
|caption=  
 
|caption=  
|route= [[Gwalior]] to [[Bhind]]<br>[[Gwalior]] to [[Shivpur]]<br>[[Gwalior]] to [[Sipri]]
+
|route= [[Gwalior]] to [[Bhind]]<br>[[Gwalior]] to [[Sipri]]([[Shivpuri]])<br>[[Gwalior]] to [[Sheopur|Sheopur Kalan]]  
 
|gauge1= 2' 0" NG
 
|gauge1= 2' 0" NG
 
|gauge1details= 183 miles (1905)
 
|gauge1details= 183 miles (1905)
Line 22: Line 22:
 
|timeline5details= Merged into [[Central Railway]] (IR zone)
 
|timeline5details= Merged into [[Central Railway]] (IR zone)
 
|presidency= [[Bengal]]
 
|presidency= [[Bengal]]
|stations= [[Bhind]], [[Gwalior]], [[Sabalgarh]], [[Shivpur]], [[Sipri]]
+
|stations= [[Bhind]], [[Gwalior]], [[Sabalgarh]], [[Sipri]]([[Shivpuri]]), [[Sheopur|Sheopur Kalan]]  
 
|system1date=
 
|system1date=
 
|system1details= Indian State line worked by [[Great Indian Peninsula Railway|GIPR]]
 
|system1details= Indian State line worked by [[Great Indian Peninsula Railway|GIPR]]
Line 31: Line 31:
 
}}
 
}}
  
The '''Gwalior Light Railway'''(GLR) developed a series of 2' 0" Narrow Gauge([[Rail_gauge#Narrow_Gauge|NG]]) branch lines, owned by the [[Princely states|Princely ]][[Gwalior State]] and radiating from the city of [[Gwalior]], originally worked by the [[Great Indian Peninsula Railway]](GIPR).
+
[[File: Gwallior Light Railway.png|thumb| '''Gwalior Light Railway''']]
 +
The '''Gwalior Light Railway'''(GLR) developed a series of 2' 0" Narrow Gauge([[Rail_gauge#Narrow_Gauge|NG]]) branch lines, owned by the [[Princely states|Princely ]][[Gwalior State]] and radiating from the city of [[Gwalior]], originally worked by the [[Great Indian Peninsula Railway]](GIPR).
  
“The Gwalior Light Railway is the property of the Gwallior Durbar by whom it was constructed and is maintained, stocked and worked. The working of the trains and traffic of the line was under the control of the [[Great Indian Peninsula Railway]]Company up to 30 June 1913”<ref name =Admin1918>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n251/mode/1up “Administration Report on Railways 1918” page 242 (pdf251)]; Retrieved  15 Dec 2016</ref>.
+
“The Gwalior Light Railway is the property of the Gwalior Durbar by whom it was constructed and is maintained, stocked and worked. The working of the trains and traffic of the line was under the control of the [[Great Indian Peninsula Railway]]Company up to 30 June 1913”<ref name =Admin1918>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n251/mode/1up “Administration Report on Railways 1918” page 242 (pdf251)]; Retrieved  15 Dec 2016</ref>.
  
The [[Ujjain-Agar Branch Railway]], opened 1932 as part of GLR.
+
The [[Ujjain-Agar Branch Railway]], opened 1932 as part of GLR ''(see note below) ''
  
==Gwallior Light Railway Lines in 1942==
+
==Early History==
 +
In the early 1890s Maharaja Madhava Rao Scindia established a private 2ft gauge railway, using
 +
20lb rails, in the grounds of his- palace at Gwalior with subsequent extensions (24lb rails) to the Mora residency, the state farm and a hunting lodge. He then opted for a much more extensive system for public traffic, using a heavier 30lb rail, and lines were opened from Gwalior north-east to Bhind (1899), south-west to Shivpuri (1899) and westwards to Sheopur Kalan (1904-9). From 1900 the railways were worked by the GIPR who took the gross receipts, deducted traffic expenses plus 12 ½ % for maintenance of accommodation and permanent way plus 10% general charges, the balance going to the Gwalior Durbar<ref name=Hughes>“Indian Narrow Gauge Locomotives 1863-1940”  by Hugh Hughes, published by  ‘The Continental Railway Circle’ Paragraph 20  Page 46  </ref>.
 +
 
 +
From June 1913 the working and maintenance of the GLR reverted to the Gwalior Durbar<ref name =Admin1918/>
 +
 
 +
==Gwalior Light Railway Lines in 1942==
 
Total line length 249 miles(473km)
 
Total line length 249 miles(473km)
*’Gwalior-Sipri Section’, 2ft (610mm) NG, from [[Gwalior]] to [[Sipri]], opened 1899, 74 miles(118km) <ref name =Admin1918/>  
+
* ‘Gwalior-Sipri Section’, 2ft (610mm) NG, from [[Gwalior]] to [[Sipri|Sipri(Shivpuri)]], opened 1899, 74 miles(118km) <ref name =Admin1918/>  
*’Gwalior-Bhind Section’, 2ft (610mm) NG, from [[Gwalior]] to [[Bhind]], opened 1899, 52 miles(83km) <ref name =Admin1918/>
+
* ‘Gwalior-Bhind Section’, 2ft (610mm) NG, from [[Gwalior]] to [[Bhind]], opened 1899, 52 miles(83km) <ref name =Admin1918/>
*’Gwallior-Sheopur Kalan Section’, 2ft (610mm) NG, [[Gwalior]] to [[Sabalgarh]], opened 1904; reaching [[Sheopur]] Kalan, 1909, 124 miles(200km) <ref name =Admin1918/>
+
* ‘Gwalior-Sheopur Kalan Section’, 2ft (610mm) NG, [[Gwalior]] to [[Sabalgarh]], opened 1904; reaching [[Sheopur|Sheopur Kalan]], 1909, 124 miles(200km) <ref name =Admin1918/>
* [[Ujjain-Agar Branch Railway]], opened 1932 as part of GLR. Approximate line length 44 miles(72km)  
+
* [[Ujjain-Agar Branch Railway]], opened 1932 as part of GLR. Approximate line length 44 miles(72km ).  ''This isolated line from Agar to Ujjain is 240 miles from Gwalior<ref name=Hughes/>. 'The location of Agar has not been identified and it is reported that this line was closed. ''
  
==History from 1942==
+
==History after 1942==
The railway was renamed  '''[[Scindia State Railway]]'''  in 1942 after the Scindia family who ruled Gwalior until India's independence <ref>[https://en.wikipedia.org/wiki/Scindia Wikipedia “Scindia” )]; Retrieved  15 Dec 2016</ref>.
+
The railway was renamed  ''[[Scindia State Railway]]'''  in 1942 after the Scindia family who ruled Gwalior until India's independence <ref>[https://en.wikipedia.org/wiki/Scindia Wikipedia “Scindia” )]; Retrieved  15 Dec 2016</ref>.
  
Following partition in 1947, the [[Scindia State Railway]] came under the control of the Government of India on 1 August 1950 with a route length of 294 miles(473km). The railway became part of the [[Central Railway]] Zone of [[Indian Railways]] on 5 November 1951 <ref>[http://www.indianrailways.gov.in/railwayboard/uploads/codesmanual/ADMIN_FINANCE/AdminFinanceCh1_Data.htm “Indian Railways – Railway Board “Evolution of Indian Railways” )]; Retrieved  15 Dec 2016</ref>.
+
Following partition in 1947, the [[Scindia State Railway]]came under the control of the Government of India on 1 August 1950 with a route length of 294 miles(473km). The railway became part of the [[Central Railway]]Zone of [[Indian Railways]] on 5 November 1951 <ref>[http://www.indianrailways.gov.in/railwayboard/uploads/codesmanual/ADMIN_FINANCE/AdminFinanceCh1_Data.htm “Indian Railways – Railway Board “Evolution of Indian Railways” )]; Retrieved  15 Dec 2016</ref>.
  
The ’Gwalior-Sipri Section’; the ’Gwalior-Bhind Section’ and the '[[Ujjain-Agar Branch Railway]]' have apparently all closed.
+
The ‘Gwalior-Sipri Section’; the ‘Gwalior-Bhind Section’ and the [[Ujjain-Agar Branch Railway]]have apparently all closed.
  
Modern reports indicate that only the  ’Gwallior-Sheopur-Kalan Section’,  2ft (610mm) NG, was working in 2009 as part of the [[Indian Railways]] service. A distance of 124 miles through the suburbs of Gwalior to  Sheopur Kalan <ref>[http://vikaschander.com/upper-class-to-sheopur-kalan/ “Upper Class to Sheopur Kalan by Vikas Chander posted 6 Feb 2014)]; Retrieved  15 Dec 2016</ref>.
+
Modern reports indicate that only the  ‘Gwalior-Sheopur-Kalan Section’,  2ft (610mm) NG, was working in 2009 as part of the [[Indian Railways]] service. A distance of 124 miles through the suburbs of Gwalior to  Sheopur Kalan <ref>[http://vikaschander.com/upper-class-to-sheopur-kalan/ “Upper Class to Sheopur Kalan by Vikas Chander posted 6 Feb 2014)]; Retrieved  15 Dec 2016</ref>.
  
 
== References ==
 
== References ==

Revision as of 13:18, 2 July 2020

Gwalior Light Railway
[[Image:|150px| ]]
Line of route
Gwalior to Bhind
Gwalior to Sipri(Shivpuri)
Gwalior to Sheopur Kalan
Gauge / mileage
2' 0" NG 183 miles (1905)
Timeline
1899 First two sections opened to traffic
1950 Nationalised
1951 Merged into Central Railway (IR zone)
Key locations
Presidency Bengal
Stations Bhind, Gwalior, Sabalgarh, Sipri(Shivpuri), Sheopur Kalan
System agency
Indian State line worked by GIPR
How to interpret this infobox
Gwalior Light Railway

The Gwalior Light Railway(GLR) developed a series of 2' 0" Narrow Gauge(NG) branch lines, owned by the Princely Gwalior State and radiating from the city of Gwalior, originally worked by the Great Indian Peninsula Railway(GIPR).

“The Gwalior Light Railway is the property of the Gwalior Durbar by whom it was constructed and is maintained, stocked and worked. The working of the trains and traffic of the line was under the control of the Great Indian Peninsula RailwayCompany up to 30 June 1913”[1].

The ‘Ujjain-Agar Branch Railway’, opened 1932 as part of GLR (see note below)

Early History

In the early 1890s Maharaja Madhava Rao Scindia established a private 2ft gauge railway, using 20lb rails, in the grounds of his- palace at Gwalior with subsequent extensions (24lb rails) to the Mora residency, the state farm and a hunting lodge. He then opted for a much more extensive system for public traffic, using a heavier 30lb rail, and lines were opened from Gwalior north-east to Bhind (1899), south-west to Shivpuri (1899) and westwards to Sheopur Kalan (1904-9). From 1900 the railways were worked by the GIPR who took the gross receipts, deducted traffic expenses plus 12 ½ % for maintenance of accommodation and permanent way plus 10% general charges, the balance going to the Gwalior Durbar[2].

From June 1913 the working and maintenance of the GLR reverted to the Gwalior Durbar[1]

Gwalior Light Railway Lines in 1942

Total line length 249 miles(473km)

  • ‘Gwalior-Sipri Section’, 2ft (610mm) NG, from Gwalior to Sipri(Shivpuri), opened 1899, 74 miles(118km) [1]
  • ‘Gwalior-Bhind Section’, 2ft (610mm) NG, from Gwalior to Bhind, opened 1899, 52 miles(83km) [1]
  • ‘Gwalior-Sheopur Kalan Section’, 2ft (610mm) NG, Gwalior to Sabalgarh, opened 1904; reaching Sheopur Kalan, 1909, 124 miles(200km) [1]
  • Ujjain-Agar Branch Railway, opened 1932 as part of GLR. Approximate line length 44 miles(72km ). This isolated line from Agar to Ujjain is 240 miles from Gwalior[2]. 'The location of Agar has not been identified and it is reported that this line was closed.

History after 1942

The railway was renamed Scindia State Railway' in 1942 after the Scindia family who ruled Gwalior until India's independence [3].

Following partition in 1947, the ‘Scindia State Railway’ came under the control of the Government of India on 1 August 1950 with a route length of 294 miles(473km). The railway became part of the ‘Central Railway’ Zone of Indian Railways on 5 November 1951 [4].

The ‘Gwalior-Sipri Section’; the ‘Gwalior-Bhind Section’ and the ‘Ujjain-Agar Branch Railway’ have apparently all closed.

Modern reports indicate that only the ‘Gwalior-Sheopur-Kalan Section’, 2ft (610mm) NG, was working in 2009 as part of the Indian Railways service. A distance of 124 miles through the suburbs of Gwalior to Sheopur Kalan [5].

References

  1. 1.0 1.1 1.2 1.3 1.4 “Administration Report on Railways 1918” page 242 (pdf251); Retrieved 15 Dec 2016
  2. 2.0 2.1 “Indian Narrow Gauge Locomotives 1863-1940” by Hugh Hughes, published by ‘The Continental Railway Circle’ Paragraph 20 Page 46
  3. Wikipedia “Scindia” ); Retrieved 15 Dec 2016
  4. “Indian Railways – Railway Board “Evolution of Indian Railways” ); Retrieved 15 Dec 2016
  5. “Upper Class to Sheopur Kalan by Vikas Chander posted 6 Feb 2014); Retrieved 15 Dec 2016