Difference between revisions of "Junagadh State Railway"

From FIBIwiki
Jump to navigation Jump to search
(Railway Logo added)
(1937 Report info added, layout changes , Statisics added and Classification)
 
Line 30: Line 30:
 
|system3details=   
 
|system3details=   
 
}}
 
}}
 +
 +
Also known as '''Junagad State Railway'''
  
 
The '''Junagadh State Railway''' (JunSR) was a metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) railway owned by the [[Princely states|Princely ]][[Junagadh State]] and initially worked by the ‘[[Bhavnagar-Gondal-Junagad-Porbandar Railway]]’ <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n201/mode/1up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 193]; Retrieved 7 Feb 2016</ref>
 
The '''Junagadh State Railway''' (JunSR) was a metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) railway owned by the [[Princely states|Princely ]][[Junagadh State]] and initially worked by the ‘[[Bhavnagar-Gondal-Junagad-Porbandar Railway]]’ <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n201/mode/1up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 193]; Retrieved 7 Feb 2016</ref>
Line 39: Line 41:
 
<br>Initially described as the '''Junadagh-Veraval Railway'''.
 
<br>Initially described as the '''Junadagh-Veraval Railway'''.
  
[[File:Junagadh State Railway 1931 Map.png|thumb|Junagadh State Railway 1931 Map]]
+
==Administration==
[[File:Junagadh State Railway 1938 Schematic Map.png|thumb|Junagadh State Railway 1938 Scematic Map]]
 
==Administation==
 
 
*1888-89: With the opening of the ‘Junagadh State Railway’(JunSR ) from  [[Junagadh]]  via [[Jetalsar]]  to [[Veraval]] the railway joined the administrative coalition of the '[[Bhavnagar-Gondal State Railway]]’.  <br>The coalition briefly became the '[[Bhavnagar-Gondal-Junagad-Veraval Railway]]'(BGJPV)  
 
*1888-89: With the opening of the ‘Junagadh State Railway’(JunSR ) from  [[Junagadh]]  via [[Jetalsar]]  to [[Veraval]] the railway joined the administrative coalition of the '[[Bhavnagar-Gondal State Railway]]’.  <br>The coalition briefly became the '[[Bhavnagar-Gondal-Junagad-Veraval Railway]]'(BGJPV)  
 
*1889: When the ‘[[Porbandar State Railway]]’ extension from [[Dhasa ]] reached [[Porbandar]]  the coalition finally became the [[Bhavnagar-Gondal-Junagad-Porbandar Railway| '''Bhavnagar-Gondal-Junagad-Porbandar Railway'''(BGJPR) ''- see separate page for further information'']].
 
*1889: When the ‘[[Porbandar State Railway]]’ extension from [[Dhasa ]] reached [[Porbandar]]  the coalition finally became the [[Bhavnagar-Gondal-Junagad-Porbandar Railway| '''Bhavnagar-Gondal-Junagad-Porbandar Railway'''(BGJPR) ''- see separate page for further information'']].
Line 53: Line 53:
  
 
==Development of the Junagadh State Railway==
 
==Development of the Junagadh State Railway==
 +
[[File:Junagadh State Railway 1931 Map.png|thumb|Junagadh State Railway 1931 Map]]
 +
[[File:Junagadh State Railway 1938 Schematic Map.png|thumb|Junagadh State Railway 1938 Scematic Map]]
 
*The first section from [[Jetalsar]] to [[Junagadh]] opened in 1888 and extended to [[Veraval|Veraval Docks]] in 1889, a total of 67 miles(108km)  <ref name=Admin>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n201/mode/1up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 193]; Retrieved  23 Jun 2019</ref>.  At [[Jetalsar |Jetalasar Junction]] there was a connection  to the ‘[[Gondal Railway]] - Mainline’ [[Dhasa]] to [[Jamjodhpur]].
 
*The first section from [[Jetalsar]] to [[Junagadh]] opened in 1888 and extended to [[Veraval|Veraval Docks]] in 1889, a total of 67 miles(108km)  <ref name=Admin>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n201/mode/1up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 193]; Retrieved  23 Jun 2019</ref>.  At [[Jetalsar |Jetalasar Junction]] there was a connection  to the ‘[[Gondal Railway]] - Mainline’ [[Dhasa]] to [[Jamjodhpur]].
* Initially described as the '''Junadagh-Veraval Railway'''   
+
* Initially described as the '''Junadagh-Veraval Railway'''  and became the ‘Main Line’
 
**''Line ‘A’ on 1931 and 1938 maps ''   
 
**''Line ‘A’ on 1931 and 1938 maps ''   
 
*1910-15: ‘Saradiya Branch Line’, 26 miles(42km); from Shapur , 5 miles(8km)  south-west of Junagadh,  to Saradiya <ref name=Admin/> (shown as Juniagarh  to  Kutiyana on 1931 Railways Map )  
 
*1910-15: ‘Saradiya Branch Line’, 26 miles(42km); from Shapur , 5 miles(8km)  south-west of Junagadh,  to Saradiya <ref name=Admin/> (shown as Juniagarh  to  Kutiyana on 1931 Railways Map )  
Line 64: Line 66:
 
* 1918-23: ‘Veraval-Prachi Road Branch’, 28 miles(45km); from [[Veraval]], proposed as far as [[Una]], delayed start, opened in stages from 1918, reached Prachi Road 1923 <ref name=page193>[https://ia801602.us.archive.org/6/items/in.ernet.dli.2015.96301/2015.96301.Kathiawar-Economics.pdf 1943 ‘Kathiawar Economics’ by A  B Trivedi, 1943 Digital Library of India Archive.org,  Appendix B ‘Railways in Kathiawar with opening dates, pages 193(pdf217)]</ref>.   
 
* 1918-23: ‘Veraval-Prachi Road Branch’, 28 miles(45km); from [[Veraval]], proposed as far as [[Una]], delayed start, opened in stages from 1918, reached Prachi Road 1923 <ref name=page193>[https://ia801602.us.archive.org/6/items/in.ernet.dli.2015.96301/2015.96301.Kathiawar-Economics.pdf 1943 ‘Kathiawar Economics’ by A  B Trivedi, 1943 Digital Library of India Archive.org,  Appendix B ‘Railways in Kathiawar with opening dates, pages 193(pdf217)]</ref>.   
 
**''Line ‘E’ on 1931 and 1938 maps ''   
 
**''Line ‘E’ on 1931 and 1938 maps ''   
* 1932: ‘Visavader-Dhari Branch’ 20 miles(32km); from Visavader to Dhari <ref name=page193/>.
+
* 1932: ‘Visavader-Dhari Branch’ 20 miles(32km); from Visavader to Dhari <ref name=page193/>
 
**''Line ‘F’ on 1938 map ''  
 
**''Line ‘F’ on 1938 map ''  
* 1934-35: ‘Prachi Road-Jamwala-Delwada Branch’ 31 miles(50km) <ref name=page193/>.   
+
* 1934-35: ‘Prachi Road-Jamwala-Delvada Branch’ 31 miles(50km) <ref name=page193/>.   This was an extension to the ‘Veraval-Prachi Road Branch’ (Line ‘E’ above) and on reaching Delvada in 1935  became renamed ‘Una Branch’, with a total length from Veraval to Delvada of 25 miles(95km) <ref name=Hist>[https://ia801605.us.archive.org/30/items/in.ernet.dli.2015.36650/2015.36650.India-Railway-Board-History-Of-Indian-Railways-Constructed-And-In-Progress.pdf US Archive .org pdf download of ‘History Of Indian Railways, constructed and in progress’, 31 March 1937 by ‘The Government of India - Railway Department’ page 245      pdf 288]; Retrieved 23 Aug 2020</ref>.
 
**''Line ‘G’ on 1938 map ''  
 
**''Line ‘G’ on 1938 map ''  
 
*1936-37: ‘[[Talala-Visavadar Railway]]’'  via Sasan Gir,  29½ miles(47km) MG, constructed by the JunSR.[[Talala-Visavadar Railway|''See separate page'']]
 
*1936-37: ‘[[Talala-Visavadar Railway]]’'  via Sasan Gir,  29½ miles(47km) MG, constructed by the JunSR.[[Talala-Visavadar Railway|''See separate page'']]
 +
 +
The ‘Statistics of Working’ show the year-by-year financial results from 1913-14 through to 1936-37 with a total route length of 229 miles(369km)
 +
<ref name=Hist>
 +
 +
== Classification ==
 +
[[Indian Railway Classification]] of 1926 - Class III railway system.
  
 
==Further Information==
 
==Further Information==

Latest revision as of 06:50, 24 August 2020

Junagadh State Railway
Junagadh State Railway Logo.png
Junagadh State Railway Logo.
Line of route
Jetalsar to Veraval
Gauge / mileage
Metre gauge 140 miles (1922)
229 miles (1944)
Timeline
1888 First section opened to traffic
Key locations
Presidency Bombay
Stations Jetalsar, Junagadh, Kutiyana, Veraval
System agency
1888 Bhavnagar-Gondal-Junagad-Porbandar Railway
1911 Own agency
How to interpret this infobox

Also known as Junagad State Railway

The Junagadh State Railway (JunSR) was a metre gauge(MG) railway owned by the Princely Junagadh State and initially worked by the ‘Bhavnagar-Gondal-Junagad-Porbandar Railway[1]

In 1869 a survey was undertaken and the ’Junagadh-Veraval Railway Proposal ‘ concluded that a Railway line from Junagadh to Veraval was feasible but the cost of 40 to 50 Lakhs of Rupees was too high for the Junagadh Durbar to go ahead. Proposals for a light railway system were to be looked at. [2].

In 1872 another line was proposed and the route from Veraval to Junagadh and Dhoraji was surveyed by Mr A W Forde C E, but the cost was beyond the means of Junagadh Durbar. This proposal came to nothing [3]. Construction finally commenced in 1886 from Jetalsar to Junagadh City in 1888 and onward To Veraval 1889,
Initially described as the Junadagh-Veraval Railway.

Administration

Development of the Junagadh State Railway

Junagadh State Railway 1931 Map
Junagadh State Railway 1938 Scematic Map
  • The first section from Jetalsar to Junagadh opened in 1888 and extended to Veraval Docks in 1889, a total of 67 miles(108km) [4]. At Jetalasar Junction there was a connection to the ‘Gondal Railway - Mainline’ Dhasa to Jamjodhpur.
  • Initially described as the Junadagh-Veraval Railway and became the ‘Main Line’
    • Line ‘A’ on 1931 and 1938 maps
  • 1910-15: ‘Saradiya Branch Line’, 26 miles(42km); from Shapur , 5 miles(8km) south-west of Junagadh, to Saradiya [4] (shown as Juniagarh to Kutiyana on 1931 Railways Map )
    • Line ‘B’ on 1931 and 1938 maps
  • 1912: ‘Visavadar Branch’, 26 miles(km); from Junagadh to Visavadar [4] .
    • Line ‘C’ on 1931 and 1938 maps
  • 1912: ‘Dungarpur Quarry Line’, ¾ mile(1.2km); a short spur from the ‘Visavadar Branch’, 2 miles (3.2km) south-east of Junagarh [4] .
    • Line ‘D’ on 1938 map
  • 1918-23: ‘Veraval-Prachi Road Branch’, 28 miles(45km); from Veraval, proposed as far as Una, delayed start, opened in stages from 1918, reached Prachi Road 1923 [6].
    • Line ‘E’ on 1931 and 1938 maps
  • 1932: ‘Visavader-Dhari Branch’ 20 miles(32km); from Visavader to Dhari [6]
    • Line ‘F’ on 1938 map
  • 1934-35: ‘Prachi Road-Jamwala-Delvada Branch’ 31 miles(50km) [6]. This was an extension to the ‘Veraval-Prachi Road Branch’ (Line ‘E’ above) and on reaching Delvada in 1935 became renamed ‘Una Branch’, with a total length from Veraval to Delvada of 25 miles(95km) [7].
    • Line ‘G’ on 1938 map
  • 1936-37: ‘Talala-Visavadar Railway’' via Sasan Gir, 29½ miles(47km) MG, constructed by the JunSR.See separate page

The ‘Statistics of Working’ show the year-by-year financial results from 1913-14 through to 1936-37 with a total route length of 229 miles(369km) <ref name=Hist>

Classification

Indian Railway Classification of 1926 - Class III railway system.

Further Information

See Bhavnagar-Gondal-Junagad-Porbandar Railway for period from 1899 to 1911.
and Kathiawar Peninsula Railway and Tramway Systems gives a map, timeline and relates this railway to others in the Kathiawar Peninsula.

References