Nilgiri Mountain Railway

From FIBIwiki
Revision as of 09:53, 18 July 2016 by PEA-2292 (talk | contribs) ('Robert Richard Gales' reference added)
Jump to navigation Jump to search
Nilgiri Mountain Railway
NMR up train at Kateri Road 05-02-28 04.jpg
Class 'X' on up train at Kateri Road
Line of route
Mettupalaiyam to Ootacamund
Gauge / mileage
Metre gauge 17 miles (1905)
29 miles (1908)
Timeline
1885 First company formed
1899 First section opened to traffic
1903 Line purchased by GoI
1908 Construction completed by PWD
Key locations
Presidency Madras
Stations Mettupalaiyam, Coonoor, Ootacamund
System agency
1899-1907 Madras Railway
1908 South Indian Railway
1951 Southern Railway (IR zone)
How to interpret this infobox

A metre gauge rack railway that is today a tourist attraction and a UNESCO World Heritage Site. Diesels can only haul NMR trains on the top section between Coonoor and Ooty.

“The original Nilgri Railway Company was registered on the 30th September 1885 ... and a contract was executed with the Secretary of State on the 26th February 1886. The original Company went into liquidation in April 1894 and a new Company was formed in February 1896 to purchase the line from the former Company and supply the capital required to complete it and to construct the proposed extension to Ootacamund” [1]

The metre gauge(MG) line from Mettupalaiyam to Coonoor, a length of 17 miles (27km), was completed by the new Company and opened for traffic on 15th June 1899. The railway was initially worked by the Madras Railway(MR) Company under an agreement with the Government of India(GoI).

On the offer of the new Company to sell the line it was purchased by the Government for £235,000 on the 1st January 1903 and MR continued to work the line up to 31 December 1907. Thereafter the working was undertaken by South Indian Railway(SIR) Company.

The MG extension to Ootacamund, a further 12 miles(19km), was constructed by the Government and opened 1908

History

Following the opening of the Madras Railway broad gauge line from Madras to Calicut in 1862, a 26 mile, broad gauge branch from Podanur to Mettupalaiyam was opened to traffic in 1873 and plans discussed to extend this into the Nilgiri Hills - the "Blue Mountains".

In 1885, the Nilgiri Railway Company was formed with construction beginning in 1891. Initially, it was intended to adopt the Rigi rack system but eventually the Abt rack system was chosen. Horace Bell continued to act in a private capacity as Consulting Engineer in London, he had in 1894 retired from his position in India as Consulting Engineer for the State Railway Board.

In 1896, a new company was formed with a guarantee (3% return during the construction period) from the Government of India(GoI) following the failure of the 1885 company.

In 1899 the first section, from Mettupalaiyam to Coonoor (including 12 miles of rack), was opened to working by the Madras Railway. In 1903 the GoI purchased the line and contracted its working to the Madras Railway.

When the Madras Railway was merged into the Madras and Southern Mahratta Railway in 1907, the NMR contract was awarded to the South Indian Railway. Construction of the extension from Coonoor to Ootacamund was completed by the GoI Public Works Department in 1908, Robert Richard Gales was the Engineer-in-Chief on the project [2].

In due course, the NMR became part of Southern Railway, a zone of Indian Railways.

Gallery

External links

References