Difference between revisions of "Rendel, Palmer and Tritton Partnership"

From FIBIwiki
Jump to navigation Jump to search
(Created page with "'''Rendel, Palmer and Tritton Partnership''' formed with Sir Alexander Meadows Rendel , Frederick Palmer and Mr. (later Sir) Seymour Tritton. The firm were appoint...")
 
(Izat Bridge info added)
 
Line 3: Line 3:
  
 
''The date of formation of this partnership has not been determined''
 
''The date of formation of this partnership has not been determined''
 +
 +
it is recorded that prior to this partnership the consultancy was named 'Messrs Rendel and Robertson'
 +
<ref name=Dorman>[https://dormanlongtechnology.com/Download_files/DL%20Historical/Dorman%20Long%20bridges%201930%20book.pdf Dorman Long  and Co ‘Bridges’ 1930 Edition)]; Retrieved  26 Nov 2020</ref>.
  
 
==Projects Undertaken==
 
==Projects Undertaken==
The following have been identified as appointed Consulting Engineers to the Indian Government and Indian railways:-
+
The following have been identified as appointed Consulting Engineers:-  
* '[[Reond Khud Bridge]]' assessment of engineering designs. The bridge was completed in 1927
+
* '[[Izat Bridge]]', by 'Messrs Rendel and Robertson'. The bridge was completed in 1912 for [[B&NWR]]
 +
* '[[Reond Khud Bridge]]' assessment of engineering designs. The bridge was completed in 1927 for the Indian Government and Indian railways:-
  
 
== References ==
 
== References ==

Latest revision as of 11:30, 26 November 2020

Rendel, Palmer and Tritton Partnership formed with Sir Alexander Meadows Rendel , Frederick Palmer and Mr. (later Sir) Seymour Tritton. The firm were appointed Consulting Engineers to the Indian Government and Indian railways. [1].

The date of formation of this partnership has not been determined

it is recorded that prior to this partnership the consultancy was named 'Messrs Rendel and Robertson' [2].

Projects Undertaken

The following have been identified as appointed Consulting Engineers:-

  • 'Izat Bridge', by 'Messrs Rendel and Robertson'. The bridge was completed in 1912 for B&NWR
  • 'Reond Khud Bridge' assessment of engineering designs. The bridge was completed in 1927 for the Indian Government and Indian railways:-

References