North Western Railway: Difference between revisions

Jump to navigation Jump to search
PEA-2292 (talk | contribs)
→‎Railways absorbed into NWR: Kandahar State Railway link corrected
PEA-2292 (talk | contribs)
→‎NWR Lines, Branches and Extensions: Mari Indus Railway link corrected
Line 102: Line 102:
*[[Lahore & Peshawar Railway]], opened c.1882. Main-line section constructed and worked by NWR.
*[[Lahore & Peshawar Railway]], opened c.1882. Main-line section constructed and worked by NWR.
*[[Mari-Attock Railway]], opened 1891. Opened as part of NWR Northern Frontier narrow gauge network.
*[[Mari-Attock Railway]], opened 1891. Opened as part of NWR Northern Frontier narrow gauge network.
*[[Mari-Indus Railway]]. Constructed in 1920's as part of NWR Northern Frontier narrow gauge network.
*[[Mari Indus Railway]]. Constructed in 1920's as part of NWR Northern Frontier narrow gauge network.
*[[Mashkaf-Bolan Railway]]. Under construction 1894, in service with NWR 1898; alternative to the [[Sind-Pishin State Railway]] route
*[[Mashkaf-Bolan Railway]]. Under construction 1894, in service with NWR 1898; alternative to the [[Sind-Pishin State Railway]] route
*[[Patti-Kasur Railway]]. In operation 1909-10; extension of NWR's [[Amritsar-Patti Railway]].
*[[Patti-Kasur Railway]]. In operation 1909-10; extension of NWR's [[Amritsar-Patti Railway]].