North Western Railway: Difference between revisions

Jump to navigation Jump to search
PEA-2292 (talk | contribs)
→‎Lines worked by NWR at some time: Spelling change to 'Durbar' from Darbar
PEA-2292 (talk | contribs)
m →‎Railways absorbed into NWR: Spelling change to 'Durbar' from Darbar
Line 130: Line 130:
*[[Sialkot-Narowal Railway]], opened in 1915 as part of NWR network
*[[Sialkot-Narowal Railway]], opened in 1915 as part of NWR network
*[[Southern Punjab Railway]], opened 1897. Worked by NWR; line aquired by State and merged into NWR, 1930
*[[Southern Punjab Railway]], opened 1897. Worked by NWR; line aquired by State and merged into NWR, 1930
*[[Suchetgarh-Jammu Railway]]. Opened 1890 as a Kashir Darbar line, worked by NWR and incorporated into [[Jammu-Sialkot Railway]]  
*[[Suchetgarh-Jammu Railway]]. Opened 1890 as a Kashir Durbar line, worked by NWR and incorporated into [[Jammu-Sialkot Railway]]  
*[[Sutlej Valley Railway]], opened 1910. Merged into SPR, 1917-18; aquired by State and merged into NWR, 1930
*[[Sutlej Valley Railway]], opened 1910. Merged into SPR, 1917-18; aquired by State and merged into NWR, 1930
*[[Trans Indus (Kalabagh-Bannu) Railway]]. Opened 1913; extended 1916-22; worked and finally merged into NWR
*[[Trans Indus (Kalabagh-Bannu) Railway]]. Opened 1913; extended 1916-22; worked and finally merged into NWR