Changes

Jump to navigation Jump to search

Hoshiarpur Doab Railway

13 bytes added, 11:11, 24 January 2016
m
Internal links added
<ref>[http://www.forgottenbooks.com/readbook_text/Bengal_and_Assam_Behar_and_Orissa_1000568138/205 Forgotten Books "Bengal and Assam, Behar and Orissa: Their History" ... p.204-5.]; Retrieved 11 Dec 2015</ref>
* '''[[Jullundur-Doab Railway]]''', opened 1912. Apparently this railway could have originally been been part of [[Southern Punjab Railway]](SPR) and then renamed to form the Hoshiarpur Doab Railway* '''[[Jullundur-Mukerian Railway]]''', metre gauge([[Rail_gauge_#Metre_Gauge|MG]]), 44 miles (70km), opened 1914-15. Part of Jullundur-Doab Railway; which was renamed Hoshiarpur Doab Railway<ref name=name/>* '''[[Jullundur-Nakodar Chord Railway]]''', opened after 1914. Part of Jullundur-Doab Railway); renamed Hoshiarpur Doab Railway* '''[[Phagwara-Rahoa(Rahon) Railway]]''',metre gauge([[Rail_gauge_#Metre_Gauge|MG]]), 25 miles (40km), opened 1915-16 as part of Hoshiarpur Doab Railwayand extended in 1917 by a further 10 miles (16km).<ref name=name/> * '''[[Jaijon Extension Railway]]''', opened before 1920 as part of Hoshiarpur Doab Railway
The network of lines were all worked and apparently finally absorbed by [[North Western Railway]](NWR)
9,628
edits

Navigation menu