Changes

Jump to navigation Jump to search

Bengal and North-Western Railway

111 bytes added, 06:47, 25 August 2020
m
4Classification' added and minor corrections
<br>By 1918 this increased to 2046 miles(3293km); (1242 miles plus 804 miles TSR)
<ref name=Admin1918>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n165/mode/2up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 157-162]; Retrieved 16 Apr 2020</ref>
<br>and by By 1937 there was 2108 miles(3392km); (1270 miles plus 740 miles TSR)<ref name=Admin1937>[https://ia801605.us.archive.org/30/items/in.ernet.dli.2015.36650/2015.36650.India-Railway-Board-History-Of-Indian-Railways-Constructed-And-In-Progress.pdf US Archive .org pdf download of ‘History Of Indian Railways, constructed and in progress’, 31 March 1937 by ‘The Government of India – Railway Department’pages 11-20, pdf 32-41]; Retrieved 16 Apr 2020</ref>
[[B&NWR Lines Owned and Worked|''See separate page'' '''B&NWR Lines Owned and Worked''' ''for full details of all lines'' ]]
 
== Classification ==
[[Indian Railway Classification]] of 1926 – Class 1 railway system <ref name=Admin1937/>.
==B&NWR Railway Workshops==
9,628
edits

Navigation menu