Changes

Jump to navigation Jump to search

East Indian Railway

1,148 bytes added, 13:36, 13 September 2015
Lines worked by EIR at some time: data added and links checked
==Lines worked by EIR at some time==
 
*[[Barharwa-Azimganj-Katwa Railway]], opened c.1914. Branch/Loop line extension to [[Hooghly-Katwa Railway]] worked by EIR.
*[[Central Indian Coalfields Railway]], opened 1927. [[Government of India |GoI]] owned; part worked by [[Bengal Nagpur Railway]](BNR); later amagamated with EIR.
*[[Dildarnagar-Ghazipur-Trighat Branch Railway]], opened 1880. Branch line to EIR main line; worked by EIR.
*[[Hooghly-Katwa Railway]], opened c.1914. Branch/Loop line extension to [[Barharwa-Azimganj-Katwa Railway]] worked by EIR.
*[[Jind-Panipat Railway]], opened 1916-17. Originally worked by EIR; later by [[North Western Railway]](NWR)
*[[Nalhati-Azimganj Railway]], opened 1863. Originally part of [[Indian Branch Railway]](IBR), unique 4ft gauge; worked by O&RR, 1863-72; run as State Rly, 1872; leased to EIR, 1892.
*[[Sheoraphuli-Tarakeshwar Railway]], opened 1885. Branch line opened by the [[Tarkessur Railway]] Co.; worked by EIR.
*[[South Behar Railway]], opened 1899. Leased to the State by South Bihar Railway Co.; worked by EIR.
*[[Thanesar-Kaithal Railway]], opened 1909. Branch line of [[Delhi-Umballa-Kalka Railway]]; worked by EIR, 1909.
==Lines connected to EIR system==
9,628
edits

Navigation menu