Changes

Jump to navigation Jump to search

Ghaziabad-Lahore Railway

629 bytes added, 14:30, 6 April 2020
NWR ‘Ghaziabad to Lahore Mainline’ and See Also link added
In 1886 became the ‘Ghaziabad to Lahore Section’ of the NWR
 
==NWR ‘Ghaziabad to Lahore Mainline’==
The section of the NWR mainline 339 miles(546km), was part of the [[Scinde, Punjaub & Delhi Railway]]( SP&DR) until amalgamation into NWR in 1886,. The line had been constructed in stages from [[Lahore]] to [[Amritsar]] in 1862 and via [[Jullunder]], [[Ludiana]], [[Ambala]], and [[Meerut]] to [[Ghaziabad]] completed by 1870.
**[[Amritsar-Pathankot Railway| ‘Pathankot Branch Line’]], 67 miles(107km), a branch from [[Amritsar]] via Dinanager to [[Pathankot]], opened 1884 by SP&DR, became NWR from 1886.
 
''See also'' '''North Western Railway - Lines operated and worked '''
[[Category:Railways]]
[[Category:State Railways]]
9,628
edits

Navigation menu