Changes

Jump to navigation Jump to search

Great Indian Peninsula Railway

15,512 bytes added, 14:15, 10 March 2018
no edit summary
}}
Like most [[Image:India-rail-1870.jpg|right|thumb|Map of the early railways GIPR in India, the '''1870]][[File: Great Indian Peninsula Railway Map 1909 north section.png|thumb|Great Indian Peninsula Railway''' (GIPR) was a British company, registered in London, privately owned and financed, operating under licence and guarantee from the (British) Board of Control in India and the Map 1909 – north section]][[East India CompanyFile: Great Indian Peninsula Railway Map 1909 south section.png|thumb|Great Indian Peninsula Railway Map 1909 – south section]] (EIC){{Railwaymap |railway= the North East Division|link= http://maps.google.com/maps/ms?ie=UTF&msa=0&msid=108089533651928306068.0004776aacede4ad4baa7}}
Like most of the early railways in India, the '''Great Indian Peninsula Railway''' (GIPR) was a British company, registered in London, privately owned and financed, operating under licence and guarantee from the (British) Board of Control in India and the [[East India Company]] (EIC). The GIPR was India's and Asia's first railway.
== History ==The principal economic benefit of the GIPR was the opening up of the interior to Port and City of [[Bombay]]. The narrow coastal plain of India's west side is separated from the Deccan plateau by a mountain range, the Western Ghats which rises to 3,900 feet(1200m) and which has always restricted internal communication with the Arabian Sea.
Formed in 1845, it The challenge was not until 1849 (at to create two lines through the urging of the then GovernorWestern Ghats, Lord Dalhousie) that one to the EIC sanctioned north-east and one to the GIPR to construct an experimental linesouth-east, built these were fully open by 1865 in time for cotton from the Deccan to the broad gauge of 5' 6", eastward be exported from Bombay. The first sod was turned on 31 October 1850 and to Manchester thus filling the first locomotive was used in construction on 22 December 1851, but trade gap created by the first passenger train in India did not run until 16 April 1853, when a train, with 14 railway carriages and 400 guests, left [[Bombay]] bound for [[Thane]], hauled by three locomotives: ''Sindh, Sultan,'' and ''Sahib''American Civil War. The 21 mile journey took an hour lines were exteded to link Bombay to Calcutta and fifteen minutes over the first section of the GIPR to be openedMadras by 1870.
By == History ==*1845. Registered as a company in 1845, with its head office in London, the Great Indian Peninsula railway initially proposed a length of 1300 miles, to connect Bombay with the interior of the Indian peninsula and to a major port on the east coast. It was meant for the purpose of increasing the export of cotton, silk, opium, sugar and spices <ref name=RegGIPR>[http://www.gracesguide.co.uk/Great_Indian_Peninsula_Railway:_1845_Company_Registration Grace's Guide " GIPR 1945 Company Registration] Retrieved on 3 Jul 2016</ref>.*1849, at the urging of the Governor, Lord Dalhousie, the East Indian Company(EIC) sanctioned the construction of a broad gauge([[Rail_gauge#Broad_Gauge|BG]]) railway eastward from [[Bombay]] and the Great Indian Peninsula Railway Company was incorporated on August 1, 1849 by an act of the British Parliament. It had a share capital of 50,000 pounds. On August 17, 1849 it entered into a formal contract with the EIC for the construction and operation of an experimental line, 35 miles(56 km) long. The Court of Directors of the EIC appointed [[James John Berkeley]] as Chief Resident Engineer and [[Charles Buchanan Ker]] and [[Robert W Graham]] as his assistants <ref name=GIPR>[http://www.gracesguide.co.uk/Great_Indian_Peninsula_Railway Grace's Guide "Great Indian Peninsula Railway"] Retrieved on 3 Jul 2016</ref>.*1859, GIPR was tasked with "the construction and working of the following lines, all of which terminate at Bombay, - viz. from Bombay, ''via'' Callian, to Jubbulpore, to meet the East Indian Railway Company's line from Allahabad, with branches to Mahim and Nagpore - 870 miles; and from Callian, ''via'' Poonah and Sholapore, to the opposite side of the river Kristna, to meet the line, ''via'' Bellary, from Madras - 366 miles - total, 1,236 miles. Capital 10,000,000''l''l. Rate of Interest Guaranteed - 5 per cent. on 8,000,000''l''. capital, and 4½ per cent. on 333,000''l''. debentures, the balance to be raised upon arrangements to be hereafter made."<ref>"Money Market and City Intelligence", ''The Times'', Wednesday, 15 June 1859, #23333, 7a.</ref> [[Image:India-rail-1870.jpg|left|thumb|Map of GIPR in 1870]]  When, in 1871, the GIPR eventually reached [[Jubbulpore]] and linked to the [[East Indian Railway]] (EIR), it completed Dalhousie’s dream of a Bombay-Calcutta route. On 30 June 1900, the assets of the GIPR were purchased by the GoI and merged with those of the [[Indian Midland Railway]] into a "new" GIPR, managed by the old company. On 1 July 1925, the GoI took over direct control of the GIPR and transferred the [[Allahabad]] to [[Jubbulpore]] branch of the [[East Indian Railway|EIR]] to the GIPR.  In 1951, the GIPR combined with the [[Nizam's Guaranteed State Railway]], the [[Dholpur State Railway]] and the [[Scindia State Railway]] to become [[Central Railway]], a zone of [[Indian Railways]]. The principal economic benefit of the GIPR was the opening up of the interior to external trade. The two lines up the Western Ghats were fully open by 1865 in time for cotton from the Deccan to be exported from Bombay to Manchester thus filling the trade gap created by the American Civil War. ==Construction=====The Western Ghats===The narrow coastal plain of India's west side is separated from the Deccan plateau by a mountain range which rises 1200m (3,900 ft) and which has always restricted internal communication with the Arabian Sea. ====Bhore Ghat Incline - between Kalyan and Poona==== The GIPR south-eastern route towards Madras. Incline length: 15 miles, tunnels: 26 (totalling 2.25 miles in length),and 8 viaducts of masonry construction. [[Civil Engineers]] included: GIPR Chief Engineer 1849 - 1862: '''James James Berkley''' (surveyor and route designer). Consultant engineer 1847 - 1867: '''Arthur Anderson West''' (surveyor of the Bhore Gate Incline).<ref>[httphttps://www.icevirtuallibrarygov.comuk/government/docserveruploads/fulltextsystem/imotpuploads/attachment_data/file/228649/8330.1913pdf H.17480M.pdf "Obituary of Arthur Anderson West MICEGovernment “Statute Law Repeals: Nineteenth Report : Draft Statute Law (Repeals) Bill; April 2012"; pages 128-130 paragraphs 3.57 - 3.64] p 363Retrieved on 3 Jul 2016</ref> GIPR Engineers: Messrs Adamson and Clowser, replaced by Messrs West and Tate in November 1859'''Construction Contractors'''
The contract was awarded (autumn 1855) to '''William Frederick FaviellBombay - [[Callian]]''' - 33.5 miles(54km)*1850-51, the first sod was turned on 31 October 1850 and work begun at Bhore Ghat the first locomotive was used in construction on 24 January 185622 December 1851*1853 April 16. In March 1859A train, with 14 railway carriages and 400 guests, Faviell gave up his contract; left [[Bombay]] bound for a short time, two GIPR engineers[[Thane]], hauled by three locomotives: '''Swainson Adamson'Sindh, Sultan,'' and ''Sahib'George Louis Clowser'. The 21 mile(34km) journey took an hour and fifteen minutes, it was the first section of the GIPR to be opened and the first railway for passenger service in India.*1853-54, the continuation of the line from [[Thane]] to [[Callian]] (later named [[Kalyan]]) was the first contact awarded to [[Messrs. Wythes and Jackson, Construction Contractors|Messrs. Wythes and Jackson]] <ref name=GGW&J>[http://www.gracesguide.co.uk/Wythes_and_Jackson Grace'', carried s Guide "Wythes and Jackson"]; Retrieved 6 Jul 2016</ref>. This section of the line involved a railway bridge over the Thane creek and the two-line [[Tannah Viaduct]] over the estuary and two tunnels. This viaduct was the first substantial railway bridge to be constructed in India and connected Bombay Island to the mainland and opened and on the work1 May 1854.
The GIPR construction contract was relet in November 1859 to Solomon Tredwell who died within fifteen days of landing in India. His wife, Alice Tredwell, assumed the contract and appointed Messrs Adamson '''North-East Line''' - [[Bombay]] via [[Callian]] and Clowser to manage the contract for her in her absence, as Mrs Tredwell returned to England. This arrangement was [[Thal Ghat Railway Construction|Thal Ghat]] to last seven years. [[Jubbulpore]] - 615 miles(990km)
“These gentlemen The GIPR Chief Engineer [[James John Berkeley]]'s proposal was to form a grand trunk communication by the north-eastern mainline between [[Bombay]] and [[Calcutta]], *1857-61, [[Callian]] (Adamson and Clowserlater named [[Kalyan]]) to [[Kasara]] section constructed, a further 42 miles(68 km)<ref>[http://www.gracesguide.co.uk/Great_Indian_Peninsula_Railway Graces Guide "Great Indian Peninsula Railway - 1865"]; Retrieved 3 Jul 2016</ref> rising to an altitude of 948 feet(289m) carried on above sea level at [[Kasara]] at the work with approach to the greatest zeal [[Thal Ghat Railway Construction|Thal Ghat]]. Opened in 1861.*1857 Aug, [[Messrs. Wythes and abilityJackson, Construction Contractors|Messrs.” Labour management could limit construction progress, but “by their good Wythes and liberal management Jackson]] were awarded the contract for the '''[[Thal Ghat Railway Construction]]''' *1857-65. The [[Thal Ghat Railway Construction|Thal Ghat Railway]] was a major project to take the GIPR mainline across the Western Ghats towards [[Jubbulpore]]. The [[Kasara]] to [[Igatpuri]] section was 9.5 miles(Adamson 15km) and Clowserwithin that distance the line had to rise to 1,918 feet(585m) collected . The construction required 13 tunnels, 6 viaducts, including the [[Ehagaon Viaduct]]; cuttings; embankments; 15 bridges and kept culverts and the Reversing Station <ref>[http://books.google.com/books?id=a5MEAAAAMAAJ&printsec=frontcover&dq=bombay+mechanics&hl=en&ei=8FUcTMGmHqC0nAeWxImdDg&sa=X&oi=book_result&ct=result&resnum=1&ved=0CCwQ6AEwAA#v=onepage&q&f=false Google Books "Paper on the work (GIPR) Thul Ghaut Railway" incline delivered to the Bombay Mechancs Institution in December 1860 by the GIPR Chief Engineer [[James John Berkeley]], page 20.] Retrieved on 2 Jul 2016</ref>.*c.1859-65, [[Messrs. Wythes and Jackson, Construction Contractors|Messrs. Wythes and Jackson]] were awarded a force further contact to construct a further section of 25the GIPR north-eastern line from [[Igatpuri]] at the end of the Thal Ghat,000 men during two seasonsthis was opened in stages reaching [[Chalisgaon]] in 1861, [[Jalgaon]] in 1863 and [[Bhusawal]] in 1865, a total of 191.24 miles(307km)<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n73/mode/2up " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; pages 64-68, pdf pages 73-77]; Retrieved 6 Jun 2016</ref>.*1861 -65, [[Igatpuri]]-[[Jalgaon]]-[[Bhusawal]] progressivly opened. *1863-67, GIPR [[Nagpur]] Branch from [[Bhusawal]] was built by [[Messrs. Lee, Watson and Ayton, Construction Contractors]]. *1865, with completion of more than 42[[Thal Ghat Railway Construction|Thal Ghat]] the mainline from Bombay reached [[Khandwar]].*1868 July, [[Robert Maitland Brereton]],000 men.”GIPR Chief Engineer was given responsibility for completing the connection between [[Bhusawal]] and [[Jubbulpore]] which he completed many months ahead of schedule <refname>[http://www.maharashtra.govthestatesman.incom/pdfmobi/gazeetter_reprintnews/Thane8th-Iday/trade_roadsthe-opening-of-the-mumbai-to-kolkata-railway/141013.html#5 SL3vjC1hEy3Vmu3P.99 The Statesman, New Delhi "The opening of the Mumbai to Kolkata railway by Michael Sandford, May 9 2016]; Retrieved Railways] Thana District Gazetteer3 Jul 2016</ref>. *1870 March 8. The [[Alfred Viaduct]] was inaugurated and named after the Duke of Edinburgh (Alfred Ernest Albert) who was visiting India and travelled by East Indian Railway from Calcutta. The Viceroy and the Governor of Bombay, Sir Fitzgerald Seymour had come from Bombay. With the opening of the GIPR North-Eastern Line the connection at [[Jubbulpore]] to the [[East Indian Railway]] (EIR) completed Dalhousie’s dream of a Bombay-Calcutta route.
'''South-East Line''' - [[Callian]] via [[Bhore Ghat Railway Construction|Bhor Ghat]] and [[Poona]] to meet the [[Madras Railway]] - 409 miles(658km)*1856 May, the line was extended to the villages of [[Palasdhari]](Padusdhurree) and to [[Khopoli]](Campoolie) <ref name====Thul wiki> [https://en.wikipedia.org/wiki/Great_Indian_Peninsula_Railway#Bombay_to_Tannah Wikipedia “Great Indian Peninsula Railway”]; Retrieved 25 June 2016</ref> at the approach to the [[Bhore Ghat Railway Construction|Bhor Ghat]]. The *1856-63. The '''[[Bhore Ghat Railway Construction]]''' was a major engineering challenge to take the GIPR mainline across the Western Ghats towards Madras. The construction with GIPR Chief Engineer [[James John Berkeley]] in charge involved an incline - between Kalyan length of 15 miles(24km), 26 tunnels (totalling 2.25 miles(3.6km) in length), and Nasik8 viaducts of masonry construction.*1858, the line from [[Khandala]] to [[Poona]] section was opened to traffic <ref name=wiki/> , this section included the [[Dapoorie Viaduct]] *1858-63, during this period, the 21 km gap to [[Khandala]] was covered by palanquin, pony or cart through the village of Campoolie <ref name=wiki/>. *1863, [[Bhore Ghat Railway Construction|Bhor Ghat]] completed the mainline was through to [[Poona]](now called Pune) and [[Sholapore]](Solapur).*1870, the [[Kistna Viaduct, Raichur(GIPR)|Kisna Viaduct]] was opened and [[Raichur]] was reached in May 1871 <ref name=Admin>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n73/mode/2up " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; pages 64-68, pdf pages 73-77]; Retrieved 23 Jul 2016</ref> where it joined the [[Madras Railway]] to link to [[Madras]] <ref name=GIPR/>.
'''Progress from 1870''' *With the completion of the GIPR mainlines the three Presidency Capitals of Bombay, Madras and Calcutta were linked. The length of the route opened was then 1483 miles/2388 km <ref name=GIPR/>. *1900 June 30, the assets of the GIPR were purchased by the GoI and merged with those of the [[Indian Midland Railway]] into a "new" GIPR, managed by the old company.*The GIPR north-eastern route towards continued to expand its network with the addition of 'Branch Lines', 'Absorbsion' of certain railways and 'Working Agreements' on other railways ''(see lists that follow)''. *1918 Administration Report on Indian Railways gives the GIPR broad gauge([[Rail_gauge#Broad_Gauge|BG]]) line length as 2668 miles(4293km); and including 2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) lines, a total of 3441 miles(5331km) <ref name=Admin/>. *1925 Jan 1, the GoI took over direct control of the GIPR and transferred the [[Allahabad]] to [[Jubbulpore]] branch of the [[East Indian Railway|EIR]] to the GIPR. *1951. The GIPR combined with the [[Nizam's Guaranteed State Railway]], the [[Dholpur State Railway]] and the Gangetic plain[[Scindia State Railway]] to become [[Central Railway]], a zone of [[Indian Railways]].
===Stations===
[[Image:Victoria Terminus. G I P Ry, Bombay.JPG‎|right|thumb|320px|''Victoria Terminus, G I P Ry, Bombay'']]Bombay's [[Bombay Victoria Terminus Construction Railway|Victoria Terminus]] was both the principal station and GIPR's HQ; designed by [[architect]] Frederick William Stevens. [[Bombay Victoria Terminus Construction Railway|Victoria Terminus Construction]] commenced in 1878, it opened on Queen Victoria's 1887 Golden Jubileeand completed in 1888.
== Records ==The GIPR had a collection of sidings spurring off to the docks in the east Bombay. There were numerous spurs to:*Victoria Dock 1891*Princes Dock 1888*Carnac Basin*Malet Basin*Frere Basin*Clerk Basin
The following are held ==GIPR Branch Lines and extensions - chronological order==This information from the “Administration Report on the Railways in the India – corrected up to 31st March 1918"<ref name=Admin/> *Khopoli Branch, SE line; [[Palasdhari]](Padusdhurree) to [[India Office RecordsKhopoli]] at (Campoolie) 1856: 7.24 miles. This section became a branch line on the opening of the [[British LibraryBhore Ghat Railway Construction|Bhor Ghat]]in 1863. *Nagpur Branch, NE line; Bhusaval to Baderna 1863-65, to Nagpur 1867: 243.25 miles*Khamgaon Branch, NE line; Jalamb to Khamgaon 1870: 7.97 miles*Amraoti Branch, NE line; Baderna to Amraoti 1871: 5.49 miles*Mohpani Branch, NE line; Gadarvada to Mohpani 1872; extended to Goitoria 1896 and to new coal-fields 1900: 13.68 miles*Manmad Branch, SE line; Dhond to Manmad: 145.44 miles*Jalagon-Alalner Branch, NE line; Jalagon to Alalner 1900: 34.26 miles*Chalisgaon-Dhulia Branch, NE line; Chalisgaon to Dhulia 1900: 34.95miles*Bombay Harbour Branch, NE line; 1910: 6.19 miles *Itsari-Nagpur Branch, NE line; Itsari to Parasia; 1913-15: 134.42 miles; finally extended to Nagpur 1923-24 as part of [[Bhopal-Itsari Railway]]*Mahim Chord, NE line; Ravali to Mahim, 1914
==Railways absorbed into GIPR== *'''L/AG/46/12/86''' : GIPR Lists of appointments (officers 1849[[Agra-1885Delhi Chord Railway]], opened 1904. Constructed to provide extra capacity between Agra and Delhi; workmen 1852worked by GIPR*[[Allahabad-1880Jubbulpore line]], opened 1867. Built by [[East Indian Railway]](EIR); transferred to GIPR, 1925*'''L/AG/46/12/88''' : [[Amraoti State Railway]], opened 1871. Branch railway to Baderna on GIPR Contracts . Worked by GIPR and finally taken over.*[[Bina-Goona-Baran Railway]], opened 1895. Owned by State of employment Gwalior and Udaipur Durbar; worked by [[Indian Midland Railway]](officers 1886IMR); amalgamated into GIPR , 1900*[[Dhond-1925Manmad State Railway]]; workmen 1881opened 1878. A 'chord' line connecting the GIPR south-eastern main line to [[Madras]] with the GIPR north-1925eastern main line to [[Allahabad]], passed to GIPR 1880. *[[Indian Midland Railway]](IMR). State agency formed 1882 to work several branch lines centred on Jhansi, amalgamated into GIPR, 1900 **[[Agra-Gwalior Railway]], opened 1881; Indian State line, owned by Gwallior Durbar, known as [[Scindia State Railway]], working taken over by IMR 1885; then in 1900 becoming part of GIPR 'Midland Section Mainline''Z/L/AG/46''' . **[[Cawnpore-Kalpi-Jhansi Railway]], opened : Index to UK Appointments to 1886. Line completed 1888 by IMR.**[[Bhopal State Railway]], opened 1884. Indian Railways State line, initially worked by IMR as Bhopal-Itarsi (1849Indian State Section).**[[Bhopal-1925Itarsi Railway]], opened 1882. State(British)Section; worked by IMR, 1885.**[[Bhopal-Ujjain Railway]], opened c.1895. Indian State line worked by IMR.**[[Bina-Katni Railway]], opened 1889. Part of IMR.**[[Dhond-Manmad State Railway]], opened 1878. A 'chord''Mss Eur D1184/14''' : Letters line connecting GIPR main lines; constructed by [[Government of India |GoI]] and handed to Arthur A West from G L Clowser Nov 1860GIPR, 1880.**[[Jhansi-Bina Bhopal Railway]], opened 1889. Part of IMR.** [[Jhansi-Gwallior and Katni Railway]], opened 1889. Part of IMR.**[[Jhansi-Konch-Nov 1861 British LibraryKalpi Railway]], Asiaopened 1886. Part of IMR. **[[Jhansi-Manikpore State Railway]], Pacific and Africa Collectionsopened 1889. Part of IMR.**[[Kunch- Madhggarh Railway]]. Project in 1906 by IMR/GIPR as extension to [[Ait-Kunch Branch Railway]]
==Lines worked by GIPR at some time - alphabetical order==
*[[Ait-Kunch Branch Railway]], opened 189?. Indian State line initially worked by [[Indian Midland Railway]](IMR); then worked by GIPR
*[[Ambaji-Taranga Light Railway]], opened 1919-20. Unassisted Company formed 1917; apparantly worked by GIPR
*[[Baran-Kotah Railway]], opened 1908. Worked by GIPR , 1909
*[[Cawnpore-Banda Railway]], opened 1913-14. Worked by GIPR , 1914
*[[Central Provinces Railway Co Ltd]](CPR). A British owned company, formed 1910, operating a group of NG lines; all worked by GIPR ; under [[Government of India |GoI]] management, 1925
**[[Darwha-Pusad Railway]], opened 1931. Part of CPR
**[[Dhond-Baramati Railway]], opened 1914-15. Part of CPR
**[[Ellichpur-Murtazapur-Yeotmal Railway]], opened first section opened as Yavatmal Murtijapur Railway 1903, extended to Ellichpur 1913 . Known informally as [[Shakuntala Railway]]. Part of CPR
**[[Pachora-Jamner Light Railway]], opened 1919. Part of CPR
**[[Pulgaon-Arvi Railway]], opened 1917-18. Part of CPR
*[[Gwalior Light Railway]], opened 1899. Owned by State of Gwalior; worked by GIPR; renamed [[Scindia State Railway]] 1944
**[[Ujjain-Agar Branch Railway]], opened 1932. Part of [[Gwalior Light Railway]]
*[[Khamagaon-Jalna Railway]]. The date of opening of the railway is not known; the railway was under consideration in 1906.
*[[Khamgaon Branch Railway]]. Short branchline of 12km between Jalamb and Khamgaon; worked by GIPR. The date of opening of the railway is not known.
*[[Salsette Trombay Railway]], opened 1928. Operated by GIPR, closed 1934
**[[Kurla-Trombay Railway]], opened 1928. Part of [[Salsette Trombay Railway]]; worked by GIPR
*[[Nizam's Railway]], opened 1874. Worked by GIPR until 1878; then by [[Government of India |GoI]]; became [[Nizam's Guaranteed State Railway]], 1886
*[[Pench Valley Coalfield Railway]], opened 1913. Private Branch Line to [[Itarsi-Nagpur Railway]]; worked by GIPR
*[[Wardha Valley Railway]], opened 1874. Worked by GIPR, also called Wardha Coal Railway
*[[Wardha-Warora Railway]], opened. Opened in 1877, managed by GIPR by 1905
==NotesRecords==An on-line search of the [[India Office Records]] (IOR) records relating to this railway<ref>[http://searcharchives.bl.uk/primo_library/libweb/action/search.do?vid=IAMS_VU2 British Library “British Library Archives and Manuscripts Catalogue” - Search]; Retrieved 22 Jan 2016</ref> gives 136 references . The most important being:-*'''L /AG/46/12 ''' “Records of the Great Indian Peninsula Railway Company; 1845-1926”*'''L/>AG/46/12A ''' “Records of the Great Indian Peninsula Extension Railway Company; 1863-1869”
==Personnel==
'''IOR Records'''
The following [[India Office Records]] (IOR) are relevant :-
*'''L/AG/46/12/86''' : GIPR Lists of appointments (officers 1849-1885; workmen 1852-1880)
*'''L/AG/46/12/88''' : GIPR Contracts of employment (officers 1886-1925; workmen 1881-1925)
*'''Z/L/AG/46''' : Index to UK Appointments to Indian Railways (1849-1925)
*'''Mss Eur D1184/14''' : Letters to Arthur A West from G L Clowser Nov 1860-Nov
'''FIBIS Resources'''*[http://search.fibis.org/frontis/bin/aps_browse_sources.php?mode=browse_components&id= External Links =1068&s_id=323 List of Indian Railways UK Contracted Staff taken from IOR Series L/AG/46/12]. FIBIS database
'''[[Great Indian Peninsula Railway Personnel]]''' gives details of GIPR staff from several other sources:-
*Grace's Guide<ref>[http://www.gracesguide.co.uk/Main_Page “Grace’s Guide”]; Retrieved 3 Jul 2016</ref>
*Wikipedia and many other sources.
== External links ==*[http://wwwen.allen-family-treewikipedia.co.ukorg/wiki/solomon-tredwell.html Solomon and Alice Tredwell, contractors for Bhore GhatGreat_Indian_Peninsula_Railway Great Indian Peninsula Railway] ''Instone Family Tree''.Wikipedia
*[http://www.scienceandsociety.co.uk/results.asp?txtkeys1=Great+Indian+Peninsula+Railway GIPR picture gallery] ''Science & Society Picture Library''.
*[http://the-railway-imagehansard.fotopicmillbanksystems.netcom/commons/c600548.html GIPR picture gallery1899/aug/03/guaranteed-railways-in-india "Guaranteed Railways in India"] ''David FlitcroftHansard 1803-2005's Photographs''.(accessed 04 December 2008)
*[https://web.archive.org/web/20100126031433/http://hansardwww.millbanksystemscentralrailwayonline.com/commonsaboutus.jsp History (of Central Railway)] ''Central Railway (Indian Railways)''. (now an archived site)*[http://en.wikipedia.org/wiki/Chhatrapati_Shivaji_Terminus Victoria Terminus, (GIPR HQ & station <nowiki>[</nowiki>Bombay<nowiki>]</nowiki>)] Wikipedia (now known as Chhatrapati Shivaji Terminus)*[https://web.archive.org/1899web/20131120075151/http://www.livemint.com/augLeisure/03vim0PsB8bW75gL0GQFEkaK/guaranteedMumbai-Multiplex--The-railwaysline-starts-here.html "Mumbai Multiplex : The line starts here"] by Supriya Nair 4 January 2013. livemint.com "The ‘heritage wing’ of Chhatrapati Shivaji Terminus is a railway enthusiast’s dream"*[http://indianexpress.com/article/india/india-innews-india /mumbai-over-100-documents-of-great-indian-peninsula-railway-to-be-digitised-2907994/ "Guaranteed Railways in IndiaMumbai: Over 100 documents of Great Indian Peninsula Railway to be digitized"] by Neha Kulkarni, July 12, 2016 ''Hansard 1803The Indian Express''.==Historical photographs online==*[https://cudl.lib.cam.ac.uk/view/PH-Y-03022-S/1 Hawkes collection of Indian Railway Photographs (Y3022S)] Royal Commonwealth Society Library/ University of Cambridge Digital Library. The description states "An album containing albumen prints of various sizes by R. Phillips of Darjeeling, Samuel Bourne and others. The name of F.A. Hawkes, who was an engineer... appears frequently in it". :Once inside the digital file, click on Contents for image titles. includes photographs whose titles include GIPR 1868-20051869.===Historical books online===*[https://books.google.com.au/books?id=MnAgAQAAMAAJ&pg=PR3 ''The Cotton and Commerce of India: considered in relation to the interests of Great Britain; with remarks on Railway Communication in the Bombay Presidency‬'' ] by John Chapman, founder and late manager of the Great Indian Peninsula Railway Company 1851 Google Books. [https://books.google.com.au/books?id=MnAgAQAAMAAJ&pg=PR19 Contents-Railway Chapters] page xix.*[http://books.google.com/books?id=a5MEAAAAMAAJ&printsec=frontcover&dq=bombay+mechanics&hl=en&ei=8FUcTMGmHqC0nAeWxImdDg&sa=X&oi=book_result&ct=result&resnum=1&ved=0CCwQ6AEwAA#v=onepage&q&f=false Paper on the (accessed 04 December 2008GIPR)Thul Ghaut Railway incline] by James John Berkley: GIPR Chief Engineer, Bombay, 1860.*[http://www.archive.org/stream/reminiscencesofo00brer#page/8/mode/2up ''Reminicences of an old English Civil Engineer 1858 -1908''] by Robert Maitland Brereton 1908 Archive.org. Includes [http://archive.org/stream/reminiscencesofo00brer#page/48/mode/2up Appendix: India] page 49. Brereton's account of working on the GIPR 1857-1870. He became Chief Engineer.
*[http://www.centralrailwayonline.com/aboutus.jsp History (of Central Railway)] ''Central Railway (Indian Railways)''.
*[http://en.wikipedia.org/wiki/Chhatrapati_Shivaji_Terminus Victoria Terminus, (GIPR HQ & station[Bombay])] Wikipedia (now known as Chhatrapati Shivaji Terminus)
*[http://books.google.com/books?id=a5MEAAAAMAAJ&printsec=frontcover&dq=bombay+mechanics&hl=en&ei=8FUcTMGmHqC0nAeWxImdDg&sa=X&oi=book_result&ct=result&resnum=1&ved=0CCwQ6AEwAA#v=onepage&q&f=false Paper on the (GIPR) Thul Ghaut Railway incline: ] By James John Berkley: GIPR Chief Engineer, Bombay, 1860.
{{Railwaymap #widget:Google PlusOne|railwaysize= the North East Divisionsmall|link= http://maps.google.com/maps/ms?ie=UTF&msa=0&msidcount=108089533651928306068.0004776aacede4ad4baa7true
}}
== References ==  <references />
[[Category:Railways]]
[[Category:Guaranteed Railways]]
[[Category:State Railways]]
9,628
edits

Navigation menu