Changes

Jump to navigation Jump to search

Howrah-Burdwan Chord Railway

893 bytes added, 16:13, 16 February 2019
Revised page combined with 'Howrah-Burdwan Chord Line' page which is now deleted (duplicated info)
The '''Howrah-Burdwan Chord Railway''' was part of [[East Indian Railway]](EIR) system.The line broad gauge([[Rail_gauge#Broad_Gauge|BG]]) opened in 1917 and provided shorter link to [[BardhamanBurdwan]] from the EIR hub at [[East Indian RailwayHowrah]](EIR)EIR hub at . Prior to the opening of the Howrah-Burdwan chord the only line was the [[HowrahSheoraphuli-Tarakeshwar Railway]]which had been constructed in 1885.<ref>[https://en. wikipedia.org/wiki/Howrah%E2%80%93Bardhaman_main_line Wikipedia "Bardhaman main line"]; Retrieved 16 Feb 2019</ref>
Prior The [[Howrah]] to the opening Saktighar section of the Howrah–Bardhaman chord the only line EIR network was the completed in 1917; 45 miles(72km)<ref>[[Sheoraphuli-Tarakeshwar Railwayhttps://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n62/mode/1up “Administration Report on Railways 1918” page 54 (pdf62)]] which had been constructed in 1885; Retrieved 16 Feb 2019</ref> .
==External Links==The line, length 55 miles(87km) from [[Lillooah]] station, 4 miles from [[Howrah]] was to relieve the heavily worked section of the EIR network to [[Burdwan]] *<ref>[httpshttp://endspace.wikipediagipe.orgac.in/wikixmlui/Howrah%E2%80%93Bardhaman_main_line Wikipediabitstream/handle/10973/18185/GIPE-015962.pdf?sequence=3&isAllowed=y “Administration Report on the Railways in India 1916” page 12]; Retrieved 16 Feb 2019</ref>
==Further Information==
See '''[[East Indian Railway]]'''
<br>and '''[[East Indian Railway - Lines owned and worked]]''' page
 
== References ==
<references />
[[Category:Railways]]
[[Category:State Railways]]
9,628
edits

Navigation menu