Changes

Jump to navigation Jump to search

Jodhpur-Bikaner Railway

7,473 bytes added, 09:35, 4 March 2020
JBR Railway Workshops added ti infobox
|company12details=
|headquarters= [[Jodhpur]]
|workshop= [[Jodhpur]], [[Bikaner]] <br>see also [[JBR Railway Workshops]]
|stations= [[Bhatinda]], [[Bikaner]], [[Hissar]], [[Hyderabad, Sind|Hyderabad]], [[Jodhpur]], [[Kuchaman]], [[Luni]], [[Marwar]]
|system1date= 1924
}}
The '''[[File: Jodhpur-Bikaner Railway''' (JBR) was a metre gauge system, jointly owned and operated by the [[Princely statesMap 1909.png|thumb|Princely ]][[Jodhpur State]] and [[Bikhaner State]] until 1924 when the system was split between the newly-formed [[Jodhpur State Railway|Jodhpur]] and [[Bikhaner State Bikaner Railway|Bikhaner State RailwaysMap 1909]].
The '''Jodhpur-Bikaner Railway''' (JBR) was a metre gauge ([[Rail_gauge_#Metre_Gauge|MG]]) system, jointly owned and operated by the [[Princely states|Princely ]][[Jodhpur State]] and [[Bikaner State]] until 1924 when the system was split between the newly-formed [[Jodhpur State Railway]] and [[Bikaner State Railway|Bikaner State Railways]].
== History ==
'''Jodhpur Railway'''
The JBR had its beginnings in as the Jodhpur Railway with the decision by Maharaja Jaswant Singh, to build a section of metre gauge(railway line from Bitoora to his capital city [[Rail_gauge_#Metre_Gauge|MGJodhpur]]) railway built for . Douglas Joscelyne, an executive engineer, was posted from the [[Rajputana-Malwa RailwayPublic Works Department]] between <ref>[[Marwar]] https://play.google.com/books/reader?id=b2NPAAAAMAAJ&printsec=frontcover&output=reader&hl=en_GB&pg=GBS.PA535 “The India List and [[Luni]Indian Civil List for 1905” page 535 ]; Retrieved 19 Nov 2016</ref> to Rajputana for this work. Later this The construction on Bitoora-Pali section was extended to commenced on February 16, 1881 and was completed on February 28, 1882 as a metre gauge([[JodhpurRail_gauge_#Metre_Gauge|MG]] and formed the first '''Jodhpur Railway''') line<ref name=Admin1918>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n194/mode/1up “Administration Report on Railways 1918” page185, pdf page 194]; Retrieved 18 Nov 2016</ref>.
Bitoora became known as Marwar Junction with a connection to MG [[Bombay, Baroda and Central India Railway]](BB&CIR) MG Rajputana Section between [[Ajmer]] and [[Palanpur]] that had opened in 1881. [[Walter Home]] succeeded Joscelyne in April 1882, deployed from the [[Public Works Department]] Railways Branch, appointed as Manager for the construction of the Jodhpur Railway and also in-charge of the Marwar State Public Works Department. He built the Jodhpur Railway from scratch over the ensuing 25 years <ref name=Home>[http://www.irfca.org/articles/eminent-railwaymen.html#home “Eminent Railwaymen of Yesteryears – Walter Home” by R R Bhandari, July 2008, reproduced by Indian Railways Fan Club]; Retrieved 19 Nov 2016</ref>. The first section of Jodhpur Railway from Marwar Junction to Pali was opened for traffic in 1882, extended Luni 1884 and reached Jodhpur in 1885 railways <ref name=Admin1918/>.  In 1887, a proposal was put forward for linking up [[Jodhpur]] with other important towns of the State like Nagaur and Makrana and with a possible rail link to [[Bikaner]]. Both these were given due consideration in forming the expansion proposals of Jodhpur Railway. The outcome were agreements dated July 13 and 30 1889, between the British Government, Maharaja of Jodhpur and Maharaja of Bikaner for the construction of a railway from Jodhpur to Bikaner <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n195/mode/1up “Administration Report on Railways 1918” page186, pdf page 195]; Retrieved 18 Nov 2016</ref>.. This agreement of 1889 was unique, in that, it was first of its kind in which two States native rulers decided to co-operate and invest in an enterprise for the benefit of both and public at large. The title of Jodhpur Railway was changed to Jodhpur Bikaner Railway (JBR). [[Walter Home]] now the Manager of JBR was promoted and Bikhaner formed placed in the list of Superintending Engineers <ref name=Home/>. '''Jodhpur-Bikaner Railway'''  In 1889, the two States of Jodhpur and Bikaner formed the Jodhpur-Bikaner Railway (JBR) to promote railway development jointly within the Rajasthan Agency.
In 1891, rapid progress was made in constructing the railway from [[Jodhpur]] to [[Bikaner]], later (1901-1902) extended to [[Bhatinda]] where the JBR connected with the Metre Gauge([[Rail_gauge_#Metre_Gauge|MG]]) section of the [[Bombay, Baroda and Central India Railway]], and the Broad Gauge([[Rail_gauge#Broad_Gauge|BG]]) [[North Western Railway|North Western]] and the [[Southern Punjab Railway|Southern Punjab Railways]].
<ref>[https://ia801009.us.archive.org/8/itemsstream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System.pdf #page/n193/mode/2up " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; pages 185 to 192 (pdf193)]; Retrieved 19 Nov 2016</ref> By 1906 the [[Jodhpur-Bikaner Railway]] was having operations over 828 miles in the territories of Sind (under British control) and 187in territories of the States of Jodhpur and Bikaner. In October 1906 [[Walter Home]] resigned.  In 1924, the JBR was split into its two constituent parts, with two new systems, the [[Jodhpur State Railway|Jodhpur]] and [[Bikaner State Railway|Bikaner State Railways]], formed to work the lines. ==The JBR Network== '''Jodhpur Section''' - 1918 grand total, 687 miles(1105km) <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n193/mode/1up “Administration Report on Railways 1918” page185, pdf page 193]; Retrieved 18 Dec Nov 2016</ref>.  *Main Line, MG,342 miles(550km)**Kuchman Road-Jodhpur, opened 1891-93, 137 miles **Jodhpur- Luni Junction, opened 1885, 20 miles**Luni Junction-Balotra, opened 1887, 50 miles**Balotra-Barmer, opened 1899, 60 miles. This section formed part of the [[Shadipalli-Balotra Railway| ‘Shadipalli-Balotra Railway’ '' - see separate page '']] .**Barmer-Jodhpur Frontier, opened 1900, 74 miles. This section formed part of the [[Shadipalli-Balotra Railway| ‘Shadipalli-Balotra Railway’ '' - see separate page '']]  *Pachpadra Branch Line, MG, 10 miles(16km)**Balotra-Pachpadra, opened 1887, 10 miles *Marwar Junction Extension Line, MG, 44 miles(71km)** Luni Junction-Marwar Pali, opened 1884, 25 miles**Maewar Pali-Marwar Junction, opened 1882, 19 miles *Phalodi Branch Line, MG, 79 miles(127km)**Jodhpur-Osian, opened 1913, 34 miles**Osian-Phalodi, opened 1914, 45 miles *Merta City Branch Line, MG, 19 miles(31km)** Merta Road-Merta City, opened 1905, 19 miles *Bhagu Extension Line, MG, 59 miles(95km)**Merta Road-Nagaur, opened 1891, 35 miles**Nagaur-Bhagu, opened 1891, 24 miles *Marwar Frontier Line, MG, 61 miles(98km)**Degana-Marwar Frontier, opened 1909, 61 miles *Ladna Extension Line, MG, 5 miles(8km)**Jaswantgarg-Ladna, opened 2015, 5 miles *Sanderao Extension Line, MG, 78 miles(125km)** Marwar Junction-Sanderao, sanctioned for construction 1914, 78 miles '''Bikaner Section''' - 1918 grand total, 630 miles(1013km) <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n195/mode/1up “Administration Report on Railways 1918” page187, pdf page 195]; Retrieved 18 Nov 2016</ref>.  *Main Line, MG, 249 miles(401km)**Bhagu(Marwar Frontier)-Bikaner, opened 1891, 48 miles**Bikaner-Dumera, opened 1898, 42 miles**Dulmera-Suratgarh, opened 1901,71 miles**Suratgarh-Bhatinda, opened 1902, 88 miles *Hisar Extension Line, MG, 136 miles(219km)**Marwar Frontier to Ratangarh, opened 1909-10, 30 miles**Ratangarh-Churu, opened 1910, 26 miles**Churu-Hisar, opened 1911, 80 miles *Bikaner-Ratangarh Chord Line, MG, 85 miles(137km)**Bikaner-Ratangarh, opened 1912, 85 miles *Sardarshahr Extension Line, MG, 27 miles(43km)**Hudera(2 miles from Ratangarh)- Sardarshahr, opened 1916, 27 miles  *Hanumangarh-Sadupur Line, MG, 105 miles(169km)** Hanumangarh-Sadupur, sanctioned for construction 1915, 105 miles *Bikaner-Kolayat Line, MG, 27 miles(43km)** Bikaner-Kolayat , sanctioned for construction 1915, 27 miles
In 1924==Lines worked by JBR =='''[[Jodhpur-Hyderabad Railway]] (British Section) ''' – MG, 1918 grand total, the JBR was split into its two constituent parts124 miles(200km) <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n197/mode/1up “Administration Report on Railways 1918” page188, with two new systemspdf page 197]; Retrieved 18 Nov 2016</ref>. *Hyderabad-Shadipali, the opened 1892 as a broad gauge([[Jodhpur State RailwayRail_gauge#Broad_Gauge|JodhpurBG]] ) line; converted to MG in 1901, 56 miles. The section extended eastward from Shadalpi as far as Umarkot and was also known as the is [[Bikhaner State Hyderabad-Umarkot Railway|Bikhaner State Railways]].*Shadipali-Jodhpur Frontier, opened 1900, formed to work the lines.68 miles
==JBR Lines and extensions==*'''[[Mirpur Khas-Jhudo Railway]]''', opened 1909 as a section of JBR; then by JSRMG, 50 miles(80km) <ref>[https://archive. *[[Mirpur Khasorg/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n198/mode/1up “Administration Report on Railways 1918” page189-Khadro Railway91, pdf page 198]], opened 1912 as a section of JBR; then by JSRRetrieved 18 Nov 2016</ref>.
==Lines Owned, managed and maintained by JBR, worked by as part of the JBR at some time==network *[[HyderabadJamro Junction-Umarkot Railway]]; surveyed 1890Jhudo, opened 1909, 50 miles. Section opened 1892 as part of '''[[JodhpurMirpur Khas-Hyderabad Khadro Railway]] ''', MG, 49 miles(British Section79km)<ref>[https://archive. Worked org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n200/mode/1up “Administration Report on Railways 1918” pages 190-192, pdf page 200]; Retrieved 18 Nov 2016</ref>.  Owned, managed and maintained by JBR until 1924; then by JSR, worked as part of the JBR network.*[[JodhpurMirpur Khas-Hyderabad Railway]] (British Section). Fully Khadro, opened 1901. Worked by JBR until 1924; then by JSR1912, 49 miles.* '''[[Pipar Road-Ravi Light Railway]]''', opened 1910 as part of 2ft/610mm narrow gauge([[Pipar-Bilara Light RailwayRail_gauge#Narrow_Gauge|NG]]), 25 miles(40km)<ref>[https://archive. Worked org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n201/mode/1up “Administration Report on Railways 1918” page 192, pdf page 201]; Retrieved 18 Nov 2016</ref>. Constructed as a steam tramway and initially worked by Jodhpur Durbar, taken over by JBR*Pipar Road-Bhavi, opened 1910; then JSR, 192419 miles*Bhavi-Bilara, opened 1912, 6 miles
==Records==
An on-line search of the IOR records relating to this railway
<ref>[http://searcharchives.bl.uk/primo_library/libweb/action/search.do?vid=IAMS_VU2 “British Library Archives and Manuscripts Catalogue” - Search]; Retrieved 24 Jan 18 Nov 2016</ref>
gives the following: -
*'''L/F/8/20/1684 ''' “Jodhpur-Bikaner Railway System, Reprint of Contracts; 1922”
*'''L/PWD/8/228 ''' “ File 181A Jodhpur-Bikaner Railway; 1901”
 
==Further Information after 1924==
See '''[[Jodhpur State Railway]]'''
 
and '''[[Bikaner State Railway]]'''
== References ==
9,628
edits

Navigation menu