'''Krishna Railway Bridge, Kudachi'''

[[File:Krishna Railway Bridge, Kudachi.png|thumb| Krishna Railway Bridge, Kudachi]]

The bridge comprised fourteen spans of 150 feet, metre gauge and carried the [[Southern Mahratta Railway]] (SMR) which runs south from [[Poona]] and runs about 60 miles inland and therefore parallel to the range of high hills which border the west coast. The bridge crossed the Krishna River at [[Kudachi]] between [[Miraj]] and [[Belgaum]]

The bridge was under constructed in 1885 with [[Charles Herbert Parker]] serving under [[H C Stables]], Executive Engineer; the bridge opened Dec 1887
<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n94/mode/1up Administration Report on Railways 1918” page 86(pdf94)]; Retrieved 24 Feb 2020</ref>.

The bridge was regirdered in 1929 following detection of structural failings
<ref>[https://www.icevirtuallibrary.com/doi/abs/10.1680/imotp.1929.14355 Institute of Civil Engineers article ‘The regirdering of the Railway Bridge over the Krishna Railway,’Minutes of the Proceedings of the Institution of Civil Engineers, Volume 227 Issue 1929, 1929, pp. 245-256]; Retrieved 24 Feb 2020</ref>.

==Further Information==
See '''[[Southern Mahratta Railway ]]'''