Changes

Jump to navigation Jump to search

Scinde Railway

77 bytes added, 10:55, 5 May 2020
m
Brunto and Bidder added
The Company had been invited to tender in 1855 by the [[Government of India]] to build a railway from [[Karachi|Kararchee(Karachi)]] to [[Hyderabad]], to be called the '''Scinde Railway''' <ref> British Library IOR/L/F/8/10 (853) ‘Contract to build a railway from Kararchee to Hyderabad’, 1855 </ref>, this being a distance of about 120 miles(192km). The company contracted with the Government of India ([[Government of India |GoI]]) to construct the initial section from [[Karachi]] to [[Kotri]]. The company was granted a 5% return on investment up to a maximum of £1 million in order to build the ‘120 mile’ line <ref name=name> [https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/228649/8330.pdf H.M. Government “Statute Law Repeals: Nineteenth Report : Draft Statute Law (Repeals) Bill; April 2012"; pages 134-135, paragraphs 3.78-3.83] Retrieved on 2 January 2016</ref>.
The London based [[Robert Stephenson]], Consultant Engineer was approached by the 'Scinde Raimway Company' for advice and in 1857 recommended [[John Brunton]] as Chief Engineer. Following Stephenson’s death in 1859 George Bidder was appointed as the Scinde Railway Consulting Engineer in London <ref>[https://books.google.fr/books?id=BzErDwAAQBAJ&pg=PA155&lpg=PA155#v=onepage&q&f=false Google Books "Robert Stephenson – The Eminent Engineer” edited by Michael R. Bailey; page 155-57]; Retrieved 4 May 2020</ref>. The exact date, extent and content of this consultation is not known but would be in the early 1850's
[[File:Scinde Railway Company - Lines.png|thumb|File:Scinde Railway Company - Lines]]
9,628
edits

Navigation menu