Changes

Jump to navigation Jump to search

Tirutturaipundi -Point Calimere Railway

64 bytes added, 15:10, 8 October 2020
m
no edit summary
‘[[Tirutturaipundi -Point Calimere Railway]]’, 28 miles(45km), opened 1919 from Tirutturaipundi to Agastiyampalli, 23 miles(37km) and extended a further 5 miles(8km) to Point Calimere in 1930. Part of the ‘[[South Indian Railway]] ‘SIR Metre Gauge’
<ref name=Hist196>[https://ia801605.us.archive.org/30/items/in.ernet.dli.2015.36650/2015.36650.India-Railway-Board-History-Of-Indian-Railways-Constructed-And-In-Progress.pdf US Archive .org pdf download of ‘History Of Indian Railways, constructed and in progress’, 31 March 1937 by ‘The Government of India - Railway Department’ pages 196-197, pdf 239-240]; Retrieved 2 Oct 2020</ref>
9,628
edits

Navigation menu