Changes

Jump to navigation Jump to search

Trans Indus (Kalabagh-Bannu) Railway

7 bytes added, 06:00, 1 December 2017
m
no edit summary
The '''Trans Indus (Kalabagh-Bannu) Railway''' (KBR) was a2ft a 2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) line, the first section between [[Kalabagh]] and [[Bannu]], 89 miles(142km) opened in 1913. The line was extended by a further 46 miles(73km) in 1916 to reach [[Tank]].
<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n137/mode/2up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 129]; Retrieved 21 Dec 2015</ref>
The line was worked by and finally merged into [[North Western Railway]](NWR.)
9,628
edits

Navigation menu