Changes

Jump to navigation Jump to search

User:PEA-2292/My sandbox

1,032 bytes added, 10:36, 20 December 2020
no edit summary
Test 1 pasting this from email ok''' East Indian Railway - Bridges and Tunnels'''
Test 2 Deleting some text ok '' This listing is not complete. ''
Test 3 Click ==1858-59 Report==The following is recorded in “Railways in India for the year 1858-59” for the ‘[[East Indian Railway]]’ -‘Bridges’<ref>[https://books.google.com.au/books?id=tp4IAAAAQAAJ&pg=PA1#v=onepage&q&f=false Online pdf version from 'Google Books' “Railways in India for the year 1858-59” by Juland Danvers , Government Director of the Indian Railways’- presented to both Houses of Parliament by HM Command. Paragraphs 21-22; Pages 9]; Retrieved 19 Dec 2020</ref>.* para 21. The most formidable obstacles which occur in the course of the line are the rivers, the chief being the Soane and the Jumna. The others are the Adjai, More, Keeul, Hullohur and Tonse. Some of the districts in Lower Bengal present also difficulties in consequence of the inundations which take place there in certain seasons.*There is only one tunnel, and that is 900 feet in length , through a rocky hill of quartz in the neighbourhood of Monghyr*para 22. The bridges have been constructed chiefly with a brick or stone foundation and a wrought iron superstructure. The difficulty in obtaining a sufficient supply of bricks led to the adoption of this plan, which was recommended on document to 'cut" slight delay but manageablethe grounds of economy and expedition by Mr M Rendel, the Consulting Engineer of the ‘[[East Indian Railway]] , who also designed the bridges over the Soane and Jumna. The former consists of 28 spans of 150 feet each and will be finished , for a single line as far as the superstructure is concerned, about the end of 1863. The latter consists of 15 spans of 200 feet . The rails will be laid upon the top of the girders, with a space beneath being made available for an ordinary carriage road 11 feet in width. They will form two of the finest structures of the kind in the world. Among the smaller bridges are those over the river:-**Adjai, consisting of 32 spans of 50 feet each**More, 24 spans of 50 feet each**Dwarka, 7 spans of 60 feet each**Branimee, 9 spans of 60 feet each**Keeul, 9 spans of 150 feet each**Hullohur, 4 spans of 150 feet each**Poon-Poon, 9 spans of 40 ft each**Tonse, 7 spans of 150 feet each
Test ==Grace’s Guide==Graces’Guide gives the following list :-*‘Bridges and Viaducts on the [[East Indian Railway]]’ in approximate date of opening order :-<ref>[https://www.gracesguide.co.uk/East_Indian_Railway:_Bridges_and_Tunnels ‘Grace’s Guide’ – ‘East Indian Railway - Bridges and Tunnels’]; Retrieved 19 Dec 2020</ref>.**1862-63, ‘[[Soane Bridge]]’. Length of 4 'Päste', slight delay but ok530 feet in 28 spans. **1865, [[Naini Bridge| ‘Naini Bridge (Jumna Bridge - Allahabad)’]]. Length of 3,080 feet in 14 spans **1866, ‘[[Jumna Bridge (Delhi)]]’. Length of 2,640 feet in 12 spans**Burdwan Viaduct of 300 arches**Bankah Bridge **Hiul Bridge**Hullohur Bridge**Adjai Bridge (Masonry)**More Bridge (Masonry)** [[Jamalpur Tunnel| ‘Jamalmpur Tunnel (Monghyr Tunnel)’]]**1887, [[Hooghly River Bridge| ‘Hooghly River Bridge (Jubilee Bridge)’]]**1874, ‘[[Howrah Pontoon Bridge]]’** ‘[[Howrah Bridge]]’** ‘[[Naini Bridge]]’**1900 Feb 27, ‘[[Upper Soan Bridge, Dehri]]’
Test 5 Show Preview ok==References==<references />
Test 6 Save Hi Mike,  Hi Mike, I had to switch the caching off on the site for now.  Can you try an edit and see how it goes in the current state? I will then try to enable the caching differently. Nik On Tue, Dec 8, 2020, 16[[Category:59 Nik Parker <nikbrightonseo@gmail.com> wrote:  Hi Mike,  I am aware of the new problem and am working on it. I think the hosting company has made a change that has caused problems. I will get back to you as soon as I can.Railways]] Nik  On Tue, Dec 8, 2020, 16[[Category:40 Mike Pearce <michaelfeildenpearce@gmail.com> wrote:  Sorry Nik,  But the Fibiwiki continues to play up. The delay reported earlier in 'Edit' mode has continued foir weeks and I have had to be patient and wait 20-30 seconds to respond.  The last four or five days has deteriorated further, thge delays above now have been compounded with failure to save.  The following message eventually appears, it is not a logging in error  Hope you can solve this my edits are piling up  Thanks Mike  Virus-free. www.avast.com  I had to switch the caching off on the site for now.  Can you try an edit and see how it goes in the current state? I will then try to enable the caching differently. Nik On Tue, Dec 8, 2020, 16:59 Nik Parker <nikbrightonseo@gmail.com> wrote:  Hi Mike,  I am aware of the new problem and am working on it. I think the hosting company has made a change that has caused problems. I will get back to you as soon as I can.  Nik    On Tue, Dec 8, 2020, 16:40 Mike Pearce <michaelfeildenpearce@gmail.com> wrote:  Sorry Nik,  But the Fibiwiki continues to play up. The delay reported earlier in 'Edit' mode has continued foir weeks and I have had to be patient and wait 20-30 seconds to respond.  The last four or five days has deteriorated further, thge delays above now have been compounded with failure to save.  The following message eventually appears, it is not a logging in error  Hope you can solve this my edits are piling up  Thanks MikeRailway Constructions‎]]
9,628
edits

Navigation menu