The Families In British India Society (FIBIS) is a self-help organisation devoted to members researching their British India family history and the background against which their ancestors led their lives in India under British rule. Let FIBIS help you break down those brick walls in your research |
Southern Punjab Railway: Difference between revisions
Jump to navigation
Jump to search
1909 Railway Map Section added |
New info added to 'History'; 'SPR Network of Lines..' replacing previous headings - withy references |
||
Line 37: | Line 37: | ||
==History== | ==History== | ||
The Company was formed in 1895. The main line ran north west from [[Delhi]] to [[Bhatinda]] then south west through Bahawalpur State to [[Samasata]], a total distance of 402 miles(643km). Several extension lines (Jullunder, Sutlej Valley etc.) extended the length to 502 miles(803km) in 1905. | The '''Southern Punjab Railway'''(SPR) Company was formed in 1895 with [[Bradford Leslie]] as Chairman. Under contract with the Secretary of State for India, Leslie and his partners formed the company to build a BG Railway from [[Delhi]] to [[Samasata]] about 400 miles to the west. | ||
[[Horace Bell ]] was the Consulting Engineer for SPR in London for the construction., | |||
The main line ran north west from [[Delhi]] to [[Bhatinda]] then south west through Bahawalpur State to [[Samasata]], a total distance of 402 miles(643km). Several extension lines (Jullunder, Sutlej Valley etc.) extended the length to 502 miles(803km) in 1905. | |||
The railway was worked by the North Western State(NWR) Railway (see "Records L/AG/46/34"). | The railway was worked by the North Western State(NWR) Railway (see "Records L/AG/46/34"). | ||
Line 43: | Line 47: | ||
Purchased by Government in 1930. | Purchased by Government in 1930. | ||
==SPR | ==SPR Network of Lines including Lines Managed and Worked == | ||
The listings below are generally based on the “Administration Report on Railways 1918” <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n121/mode/1up “Administration Report on Railways 1918” pages 120-126 (pdf 129-134]; Retrieved 18 Dec 2016</ref> with page numbers (and pdf pages) noted at the end of each entry. | |||
'''SPR Mainline and branches''' [[Rail_gauge#Broad_Gauge|BG]] Total line length 426 miles(685km). Page 121(pdf 130) | |||
*’Delhi-Samasata Mainline’, [[Delhi]] via [[Narwana]], [[Jakhal]], [[Bhatinda]] to [[Samasata]], opened 1897, 399 miles(642km) | |||
**’Delhi Brewery Branch Line’, opened 1909, 0.8 mile(1.3km) | |||
**’[[Narwana-Kaithal Railway|Narwana-Kaithal Branch Line]]’, opened 1899, from [[Narwana]] to [[Kaithal]], 23 miles(37km) | |||
**’Jind City Branch Line’, from [[Jhind|Jind]] Junction to [[Jhind|Jind]] City, opened 1916, 2.5 miles(4km) | |||
'''[[Jullundur-Doab Railway| Jullundur-Doab Extension Railway]]''' [[Rail_gauge#Broad_Gauge|BG]] Total line length 130 miles(209km). Page 123(pdf132) | |||
*’Jullunder-Ferozepore Mainline, [[Jullunder]] via Karpurthala, Sultanpur Lodi, Lohian Khas, Gidarpind, Makhu to [[Ferozepore]] Cantonment, opened 1912-14, 73 miles(117km) | |||
**’Phillaur Branch Line’, Lohian Khas to [[Phillaur]], opened 1913, 39 miles(63km) | |||
**’[[Jullundur-Nakodar Chord Railway]] known as the ‘Nakodar Branch Line’, [[Jullunder]] to [[Nakodar]], opened 1914, 19 miles(30km) | |||
'''[[Ludhiana Extension Railway]]''' [[Rail_gauge#Broad_Gauge|BG]] Total line length 152 miles(244km). Page 123(pdf132) | |||
*’Ludhiana-Ferozepore Line’, [[Ludhiana]] to [[Ferozepore]], opened 1905, 77 miles(124km) | |||
*’Ferozepore-MacLeod Ganj Line’, [[Ferozepore]] to McLeod Ganj (a suburb of [[Dharamsala]]), opened 1906, 75 miles(120km) | |||
'''[[Sutlej Valley Railway| Sutlej Valley Extension Railway]]''' [[Rail_gauge#Broad_Gauge|BG]] Total line length 208 miles(335km). Pages 124-5(pdf135-6) | |||
*[[Kasur-Lodhran Railway]], [[Kasur]] to [[Lodhran]], opened 1910, closed and dismantled 1917-18, 208 miles(335km) | |||
'''[[Ludhiana-Dhuri-Jakhal Railway]]''' [[Rail_gauge#Broad_Gauge|BG]] Total line length 79 miles(127km). Page 115(pdf124) | |||
*[[Ludhiana]] via [[Dhuri]] to [[Jakhal]], opened 1901. Managed, maintained and worked by [[North Western Railway]] (NWR) under an Agreement with the [[Princely states|Princely ]][[Maler Kotla State]] Durbar and the [[Jhind State]] Durbars. The line was used by SPR linking the ’Delhi-Samasata Mainline’ at [[Jakhal]] with '[[Ludhiana Extension Railway]]' at [[Ludhiana]]. | |||
==Records== | ==Records== |