Moghal Sarai-Howrah Railway Survey: Difference between revisions
Jump to navigation
Jump to search
Created page with "'''Moghal Sarai-Howrah Railway Survey''' Under survey 1988 and 1890 No evidence that..." |
'Personnel' heading added with text |
||
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
'''Moghal Sarai-Howrah Railway Survey''' | The '''Moghal Sarai-Howrah Railway Survey''' was undertaken from 1889 to 1890 by a team of Engineers from the [[Public Works Department]]. | ||
<ref>India Civil List 1890 PWD Railways</ref> | |||
It has not been possible to determine if this plan was adopted either in part, or completely. | |||
The Engineer-in-Chief was [[Horace Bell]] who "in February, 1889, was posted in a similar capacity to the Moghal Serai Railway Survey." | |||
<ref>[http://www.forgottenbooks.com/readbook_text/Minutes_of_Proceedings_1903_1000771908/329 Forgotten Books "Minutes of Proceedings of the Institution of Civil Engineers 1913, pages 320-1"]; Retrieved 13 Dec 2015</ref> | |||
==Personnel== | |||
*[[Paget Patrick Dease]] was deployed from the [[Public Works Department]] (PWD) as Executive Engineer to the Moghal Sarai-Howrah Railway Survey in 1890 <ref> India Civil List 1890, page 40</ref>. | |||
*[[William Paul Milne]] from PWD as Executive Engineer to the Moghal Sarai-Howrah Railway Survey in 1890 <ref> India Civil List 1890, page 41</ref>. | |||
== References == | |||
<references /> | |||
[[Category:Railway Surveys]] | [[Category:Railway Surveys]] | ||
[[Category:Railways]] | [[Category:Railways]] |
Latest revision as of 12:45, 28 May 2016
The Moghal Sarai-Howrah Railway Survey was undertaken from 1889 to 1890 by a team of Engineers from the Public Works Department. [1]
It has not been possible to determine if this plan was adopted either in part, or completely.
The Engineer-in-Chief was Horace Bell who "in February, 1889, was posted in a similar capacity to the Moghal Serai Railway Survey." [2]
Personnel
- Paget Patrick Dease was deployed from the Public Works Department (PWD) as Executive Engineer to the Moghal Sarai-Howrah Railway Survey in 1890 [3].
- William Paul Milne from PWD as Executive Engineer to the Moghal Sarai-Howrah Railway Survey in 1890 [4].
References
- ↑ India Civil List 1890 PWD Railways
- ↑ Forgotten Books "Minutes of Proceedings of the Institution of Civil Engineers 1913, pages 320-1"; Retrieved 13 Dec 2015
- ↑ India Civil List 1890, page 40
- ↑ India Civil List 1890, page 41