Naginimora Branch Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Fully checked; Further Info added with link
PEA-2292 (talk | contribs)
Revised information added with references
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
The '''Naginimora Branch Railway''' was a branch line of [[Assam-Bengal Railway]](ABR), under construction 1911.
The '''Naginimora Branch Railway''' was a branch line of the [[Assam-Bengal Railway]](ABR), under construction in 1911. The line was an extension to the [[Dikhow Extension Railway]] which opened to [[Bihubar]] in 1913.
 
The 2.3 miles(3.7km) extension from [[Bihubar]] to Naginimara, opened 1917 <ref name=Admin1918>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n161/mode/1up  " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 153]; Retrieved 20 Dec 2017</ref>


==Further Information==
==Further Information==
See [[Assam-Bengal Railway]]
See '''[[Assam-Bengal Railway]]'''
 
== References ==
<references />


[[Category:Railways]]
[[Category:Railways]]
[[Category:State Railways]]
[[Category:State Railways]]

Latest revision as of 10:41, 21 December 2017

The Naginimora Branch Railway was a branch line of the Assam-Bengal Railway(ABR), under construction in 1911. The line was an extension to the Dikhow Extension Railway which opened to Bihubar in 1913.

The 2.3 miles(3.7km) extension from Bihubar to Naginimara, opened 1917 [1]

Further Information

See Assam-Bengal Railway

References